多目标短期梯级水电优化调度混合整数模型 mixed integer model for multi-objective short-term cascaded hydropower optimal scheduling.pdfVIP

多目标短期梯级水电优化调度混合整数模型 mixed integer model for multi-objective short-term cascaded hydropower optimal scheduling.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
多目标短期梯级水电优化调度混合整数模型 mixed integer model for multi-objective short-term cascaded hydropower optimal scheduling

第 41 卷 第 4 期 电力系统保护与控制 Vol.41 No.4 2013 年2 月 16 日 Power System Protection and Control Feb.16, 2013 多目标短期梯级水电优化调度混合整数模型 葛晓琳,张粒子,王春丽 (华北电力大学电气与电子工程学院,北京 102206) 摘要:为了充分体现水电优化调度带来的效益,提出了多目标短期梯级水电优化调度的混合整数模型。模型综合考虑水电发 电效率和调峰性能,采用了系统中总剩余负荷量和剩余负荷峰谷差两个指标来评价优化方案。针对模型中的多个目标函数以 及非线性的机组运行约束,基于模糊隶属度函数和混合整数建模方法,将多目标非线性优化问题转化为单目标混合整数线性 规划问题(mixed-integer linear program, MILP),并采用先进的MILP软件包进行求解。通过某地区大规模梯级水电系统 的算例分析,结果表明了所提模型的合理性和有效性。 关键词:多目标;短期;优化调度;混合整数模型;梯级水电站 Mixed integer model for multi-objective short-term cascaded hydropower optimal scheduling GE Xiao-lin, ZHANG Li-zi, WANG Chun-li (School of Electrical and Electronic Engineering, North China Electric Power University, Beijing 102206, China) Abstract: The hybrid integer model of multi-objective optimal short-term scheduling for cascaded hydropower system is proposed, so as to fully realize the benefits of hydropower units. Two indicators which are the total surplus load and difference between peak and valley of the total surplus load are introduced to evaluate the scheduling scheme. This model takes into account both the power generation efficiency and performance of peak regulation of hydropower. Since the multi-objectives and the nonlinear constraints are included in the model, fuzzy membership function and mixed-integer modeling method are applied, and the nonlinear multi-objective optimal problem is transferred into the single-objective mixed integer linear programming (MILP) problem. And the proposed model is solved by the advanced MILP software. Through the analysis of real examples of large-scale cascaded hydropower system, the results show that the proposed model is reasonable and effective. This work is supported by National Natural Science Foundation of China (No. 5

您可能关注的文档

文档评论(0)

hello118 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档