Construction of Cheung Kong Center by (建设长江中心).pdfVIP

Construction of Cheung Kong Center by (建设长江中心).pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Construction of Cheung Kong Center by (建设长江中心)

Construction of Cheung Kong Center by Raymond Wong Wai Man Redevelopment of the Hilton Hotel site and nearby properties in Central District, Hong Kong The Cheung Kong Center exhibits a lot of special features both in the construction of the substructure and the superstructure. The substructure involved the construction of a 1.2 m thick reinforced concrete diaphragm wall along the site perimeter; excavation to form a 37m-diameter shaft pit supported on the side by diaphragm wall panels for the construction of the building core; excavation and construction of eight 6 m-diameter caissons using hand- dug method as foundations for the “super-columns” and 21 smaller caissons of 1.5m diameter for other columns that support the new basement. The building core of the superstructure is constructed using a self-climbing formwork system known as the “jump form”. The external steel frame together with the floor membrane is of composite nature with circular steel section infill with RC (concrete filled tube) as the columns, and steel joists with RC topping as the floor slab. The structural frame is supported on the lower level by 8 super-columns fabricated from heavy steel sections. A transfer truss frame and 3 sets of out-rigger frame linking onto a belt-truss system are used to stabilize the building and to improve structural performance in the taking up of wind load. The exterior of the building is to be finished using a stainless steel curtain wall system. This article aims to provide an overall illustration that highlights the above- mentioned features start from the commencing of the substructure up to the completion of the building. The previous Hilton Hotel building before it was demolished in 1995 for redevelopment as the new Cheung Kong Center Introduction building by the developer, a very fast The project situated in a 9,650 sq m track construction

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档