Annual report for reso课件.ppt

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Annual report for reso课件

P1 敌虹粪弟藕葱勉倦栈怪顺乌死桌暇途墅耐柜玻凭思棘芥憎蒜耕鉴瓦拆碎讯Annual report for reso课件Annual report for reso课件 Agenda : Executive Summary for Q4 2005 Facilities system overview Operation status and Preventive maintenance Utilities consumption Incidents Key issues review Help Desk Cleaning work Training Team building Work Plan for Q1 2006 Continuing improvement Plan for system management Business condition review Question and answer QUARTERLY BUSINESS REVIEW P2 页遥剃槐耸摹片弯低附爵糜夜挟助颐枷磋睬抛羔误临罩拉箩淆赛汤短之告Annual report for reso课件Annual report for reso课件 1.a) Facilities system overview QUARTERLY BUSINESS REVIEW System Status Description Power supply The city power supply HV line 1 is unstable ,it cut off on Dec 30 2006 The distribution panel board are dusty, need to be cleaned in Spring Festival. Water supply drainage The floating valve for water input in the fire water reservior,there is a malfunction ,now control manually . it will be repaired in Spring Festival . Cleanroom All the key data can be kept in control limit . Due to low control speed on the FFU monitoring software ,it cause impact on the control to all FFU during input data status feedback, this problem has been added into the punch list. Cooling Tower The cooling water is still dirty ,it will need to be changed with clean water. It will be done in Spring Festival by vendor. Chiller The main machine run normally , need pipe flushing in Spring festival. DI/UDI All the key data can be kept in control limit . The limit switch for the drainage is out of control, need to replace Vacuum One set of PV pump is sent to repair in Shanghai, the target return date is Jan 18 2006. CDA TOC out of Specification(10ppb); Material Lab takes Responsible to fix the issue normal function Affected user, under control System out of spec. P3 吕拄缝双桐樟按股隅褥摸宽框酸策砚媒茸魁睬虫票资浅捧为肄核债镁逮抱Annual report for reso课件Annual report for reso课件 1.a) Facility system overview QUARTERLY BUSINESS REVIEW System Status Description Boiler Some

文档评论(0)

gm8099 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档