OEE and OLE-OD file课件
KH HEAH/KF Moy;Agenda of Symposium ;1. Follow Up issues from Last Meeting/Conference;2. OEE and OLE ( Overall Equipment Efficiency Overall Labor Efficiency );OEE = Availability Rate x Performance Rate x Quality Rate
Availability Rate = how much time per shift the line is
actually running (DOWNTIME)
Performance Rate = how well the line did when it was
running (SPEED)
Quality Rate = how many quality products were
produced at the first time (QUALITY)
;The 3 OEE factors are influenced by the 6 Big Losses:
OEE Factors 6 Key Losses
Availability rate downtime 1. breakdowns
2. changeover
Performance rate speed 3. program optimization
4. reduced speed
Quality rate quality 5. rework
6. scrap
;OEE ;OEE ;Therefore, OEE forces us to look at the overall equipment
performance from:
Availability
maximized equipment uptime
Performance
maximized placement rate
Quality
maximized process yield
;Objectives:
Measure the overall efficiency in the deployment of
labor
Indicate the flexibility of labor staffing to achieve the
same output
;OLE Formula:
Σ (total unit produced x std man hour per unit)
(Total # of DL used x total paid hours)
we need to produce the targeted output with the
set # of DL at the fixed interval of time
MOST shall be the only tool being used to set the standard
man hour
Std man hour = number of man hour required to produce
ONE unit of final product based on the manufacturing
process designed with factored yield and allowances;OLE ;CHALLENGES to Implement OEE and OLE;3. Best Practices Sharing;4. Site Special Projects/Site issues highlights;5. Ops. Dev. Update/ Highlight;6. Others;