垃圾填埋场hdpe膜防渗施工方案(Landfill site hdpe film anti-seepage construction scheme).docVIP

垃圾填埋场hdpe膜防渗施工方案(Landfill site hdpe film anti-seepage construction scheme).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
垃圾填埋场hdpe膜防渗施工方案(Landfill site hdpe film anti-seepage construction scheme)

垃圾填埋场hdpe膜防渗施工方案(Landfill site hdpe film anti-seepage construction scheme) Landfill site HDPE film anti-seepage construction scheme The first chapter and the basis requirements 1. Before laying HDPE geomembrane, shall, in conjunction with the civil engineering, building, design, owner of laying base to conduct a comprehensive inspection, comply with the design requirements, construction conditions, and delivery inspection records rear can construction. 2. The base quality should comply with the design requirements: foundation pit bottom slope, slope and slope ratio, the anchorage slot, slope and handling at the junction of righteousness, the warehouse wall concrete base shall be strictly meet the design requirements. 3. The base surface shall be dry, compacted, flat, no cracks, no obvious sharp points, no mud, no sag, and the vertical depth of 25mm shall have roots, debris, stones, steel bars and glass scraps. The flatness should be smooth and smooth in the allowable range, the slope is uniform and the slope is the same. 4. The Angle of Yin and Yang on the base surface is a smooth transition, and the root of the column should be a circular arc. 5. The base surface is dry and the moisture content should be below 15%. 6. Basal uniform should be solid, dry density of soil basal shall not be less than 1.4 t / ㎡. 7. Construction of earthwork film can be carried out after the construction, supervision, design unit, owner and general contractor are accepted and approved. Chapter ii climate requirements for construction 1. The temperature should generally be above five degrees centigrade, and the geomembrane should be more tense at low temperature. The geomembrane should be relaxed during high temperature. The wind is below level four. 3. When the temperature is too low, the wind and snow should not be under construction. 4. In wind weather, when the wind force affects the construction of the geomembrane, the HDPE geomembrane for soldering can be pressed into the dungeon. C

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档