基坑支护细则(Foundation pit supporting rules).docVIP

基坑支护细则(Foundation pit supporting rules).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基坑支护细则(Foundation pit supporting rules)

基坑支护细则(Foundation pit supporting rules) Orders to record The first part of the engineering survey and the specialty engineering features... 1 In the first section of the project,... 1 In the second section, the characteristics of professional engineering... 2 The second part of the supervision work is based on... 3 Part iii process of supervision work... 4 Part iv control points and target values of supervision work... 5 In the first section, the conditions of commencement of construction are under review. 5 In the second quarter, the cement stirs. 7 In the third quarter, the well point and the precipitation... 9 In the fourth quarter, the wall was supported by the wall. 10 In the fifth section, the earth dug in. 12 Part five methods and measures of supervision work... 13 The first part of engineering survey and professional engineering characteristics Section 1 project overview Project name: nanhai yi jing yuan phase I Construction unit: foshan sansheng real estate co. LTD Design unit: guangdong nanhai architectural design institute Supervision unit: Shanghai housing project construction supervision co. LTD GD district construction unit: construction of six civil engineering companies GX construction unit: a company of three bureaux (guangzhou) This project is located in nanhai district, foshan city. It is on the third road in the east, the second in the west, the fuping road in the north, and guiping road in the south. The first phase of the proposed five buildings of 21 -- 26 floors, of which 2 of the eastern district and 3 of the west side. In the same period, there are some low-rise commercial buildings and two underground garage in the east and west. The total area is 3500M2. The total construction area is more than 130,000 square meters. The site can be wide, south and north for the second and third Spaces. The western side of the western side of the wall is about 7-8 meters from the wall, and the east side of the wall is about 18 meters from the wall. There

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档