广东省全国造价员继续教育试题(附标准答案)(National cost staff of guangdong province continue education test (with standard answer))
广东省全国造价员继续教育试题(附标准答案)(National cost staff of guangdong province continue education test (with standard answer))
Guangdong cost officials continue the education test
1. Single choice questions (total 20)
1. In the classification of claims, there may be separate claims and total claims, and the correct way of saying the total claim is (d).
A. An easy way to claim success
B. Usually adopted one way
C. A way to be forced in a particular situation
D. A more easy way to solve it
2. Under the contract law, the following types of contracts are subject to change or revocable contracts (b).
A. it is in the interests of the state to be concluded by means of fraud and coercion
B. It is unfair to conclude or enter into a major misunderstanding
C. cover illegal purposes in lawful form
D. Malicious collusion that damages the interests of the state, the collective or the third party
3. The fixed unit price contract, which of the following processing methods is correct (a) at the time of settlement.
A. no matter what happens, the unit price will not be adjusted
B. The unit price can be adjusted to exceed the scope of the contract
C. The unit price should be reduced for increasing the amount of work
D. For less work, the unit price should be increased
4. In the construction contract (demonstration text), the declaration and use of the patent technology is correct (c).
A. The developer shall apply for the application and the contractor shall bear the relevant expenses
B. The contractor shall apply for the application and the contractor shall bear the relevant expenses
C. The contractor shall use the application and submit it to the engineer for approval
D. The contractor shall use the application, and the contractor shall handle the declaration formalities, and the expenses shall be negotiated by both parties
5. The developer is required to change the decoration practice and the following methods are correct (d) at the time of settlement.
A. The price of the measures shall remain unch
您可能关注的文档
- 《区域经济发展与管理》第二讲 区域经济的形成与发展 第二节 规模经济...(Regional economic development and management second, the formation and development of the regional economy.).doc
- 《建筑与城市规划导论》读书笔记之(Introduction to architecture and urban planning).doc
- 《工程造价基础知识》教材讲义(Teaching materials for the basic knowledge of engineering cost).doc
- 《小型制冷装置设计》完全免费(Small refrigeration design is completely free).doc
- 《建筑施工技术》教学大纲(Teaching outline of construction technology).doc
- 《急危重症护理学》作业2简答题答案(A short answer to the question of emergency intensive care).doc
- 《建筑材料》试卷4(Building materials 4).doc
- 《房屋建筑学》模拟试题二(Building architecture simulation test ii).doc
- 《数据结构》算法动态演示系统的设计与实现(The design and implementation of dynamic demonstration system of data structure algorithm).doc
- 《指环王护戒使者》全攻略(Lord of the rings the fellowship of the ring).doc
文档评论(0)