砂石地基(Sandstone Foundation).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砂石地基(Sandstone Foundation)

砂石地基(Sandstone Foundation) Sandstone Foundation The technical disclosure is applicable to the engineering of sand and gravel foundation, foundation treatment and ground cushion in industrial and civil construction. 1. material requirements (1) natural graded aggregate or artificial graded sandstone. Moderately hard medium sand, coarse sand, gravel sand, crushed stone (egg), stone or other stones shall be used Industrial waste pellets. Fine sand may be used in areas where medium, coarse and gravelly sands are lacking, but a certain amount of crushed stones or pebbles shall be added at the same time The quantity shall comply with the design requirements. Good grading of particles is required. (2) grading sand and gravel materials shall not contain organic wastes such as grass roots and garbage, and shall be used for drainage and consolidation of foundations, and the mud content shall not exceed 3%. The maximum particle size of crushed stone or gravel shall not be greater than 2 or 3 of the cushion or the thickness of the paving, and shall not be greater than 50mm. 2. main machines and tools General should have bettle, frog rammer, bulldozers, rollers (6 ~ 10t), trolleys, flat shovel, water hose, 2m Small scale, thin wire, steel wire or etc.. 3. operating conditions (1) the technical appraisal of graded sandstone shall comply with the design requirements. (2) before backfilling, shall organize the relevant units to test the geological conditions of trench. Including axis size, horizontal elevation, and whether there is no water or other conditions After completing the hidden inspection procedures. (3) when the ground water level is higher than the foundation pit (trough) bottom surface, measures should be taken to reduce drainage or to reduce the water table so as to keep the foundation pit (trough) No water condition. (4) set the flag paving thickness control, such as horizontal wooden peg or elevation of pile, or at a fixed slope (wall) on the nail on the level of a

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档