- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砂石地基(Sandstone Foundation)
砂石地基(Sandstone Foundation)
Sandstone Foundation
The technical disclosure is applicable to the engineering of sand and gravel foundation, foundation treatment and ground cushion in industrial and civil construction.
1. material requirements
(1) natural graded aggregate or artificial graded sandstone. Moderately hard medium sand, coarse sand, gravel sand, crushed stone (egg), stone or other stones shall be used
Industrial waste pellets. Fine sand may be used in areas where medium, coarse and gravelly sands are lacking, but a certain amount of crushed stones or pebbles shall be added at the same time
The quantity shall comply with the design requirements. Good grading of particles is required.
(2) grading sand and gravel materials shall not contain organic wastes such as grass roots and garbage, and shall be used for drainage and consolidation of foundations, and the mud content shall not exceed 3%.
The maximum particle size of crushed stone or gravel shall not be greater than 2 or 3 of the cushion or the thickness of the paving, and shall not be greater than 50mm.
2. main machines and tools
General should have bettle, frog rammer, bulldozers, rollers (6 ~ 10t), trolleys, flat shovel, water hose, 2m
Small scale, thin wire, steel wire or etc..
3. operating conditions
(1) the technical appraisal of graded sandstone shall comply with the design requirements.
(2) before backfilling, shall organize the relevant units to test the geological conditions of trench. Including axis size, horizontal elevation, and whether there is no water or other conditions
After completing the hidden inspection procedures.
(3) when the ground water level is higher than the foundation pit (trough) bottom surface, measures should be taken to reduce drainage or to reduce the water table so as to keep the foundation pit (trough)
No water condition.
(4) set the flag paving thickness control, such as horizontal wooden peg or elevation of pile, or at a fixed slope (wall) on the nail on the level of a
您可能关注的文档
- 《计算机应用基础》第2章单选题(Chapter 2 of the computer application foundation).doc
- 《观潮》第二课时教学设计(The teaching design of the second class of guanyin).doc
- 《路桥专业初`中级专业技术资格考试大纲》(At the beginning of the road and bridge professional ` intermediate professional and technical qualification exam outline).doc
- 《计算机应用基础》2016年春在线作业三(The computer application foundation 2016 spring online work 3).doc
- 《铁路技术管理规程》普速版 第六章 2014.7(Chapter vi of the technical regulation of railway technology 2014.7).doc
- 《铁路技术管理规程》普速版 第七章 2014.7(Chapter 7 of the technical regulation of railway technology 2014.7).doc
- 《轻松历史背记口诀》(The legend of easy history).doc
- 《铁路技术管理规程》普速版 第十八章 2014.7(Chapter 18 of the technical regulation of railway technology 2014.7).doc
- 《道路建筑材料检测与应用》考试试卷(Testing and application of road building materials examination paper).doc
- 《计算机应用基础0006》15春在线作业1(Computer application base 0006 15 spring online job 1).doc
最近下载
- 2022年4月自考00320领导科学试题及答案.docx VIP
- 北方苹果沟藏保鲜技术.doc VIP
- 2023版ECPR专家共识更新解读PPT课件.pptx VIP
- 路堑高边坡专项施工方案.doc VIP
- 2024-2025学年 云南省昆明市云南大学附中星耀学校高一(上)入学数学试卷(含答案).pdf VIP
- 《湖北省应征公民政治考核档案》表格(1).pptx VIP
- M6D双通道平衡充电器使用手册.pdf
- 2020版中考化学同步习题:燃料的合理利用与开发(含解析).doc VIP
- 2025年高考英语全国一卷(新高考1卷)变化分析与备考建议课件+2026届高考英语一轮复习.pptx VIP
- 2024广西专业技术人员继续教育公需科目参考答案(98分).docx VIP
文档评论(0)