一建市政案例分析题(A construction of municipal case analysis).docVIP

一建市政案例分析题(A construction of municipal case analysis).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一建市政案例分析题(A construction of municipal case analysis)

一建市政案例分析题(A construction of municipal case analysis) A case study of municipal cases Background information (06 test points) A company contract to build urban road reconstruction project, the structure of two dust subbase, and asphalt concrete pavement on the base of the cement stable macadam mixture, time limit for a project for that year may complete the demolition, the end of November to complete the construction. Due to the large number of interference factors in urban road construction, it is difficult for the project department to prepare the construction technology in advance. The project department set up the mixing station outside the city when the cement stabilized gravel base construction. To avoid rush hour traffic during the night, during the day construction. It was found that the surface of cement stabilized gravel was loose and low in strength. The project department will choose the construction of asphalt concrete for the highest temperature period of the whole day according to the winter construction plan. The compaction degree, thickness and flatness of the asphalt concrete surface of the test section are in accordance with the design requirements, and the test results of self-inspection are qualified. In order to ensure the completion of the schedule, the project department has prepared detailed construction schedule and implemented the dynamic adjustment. Summarize the construction according to the progress plan and adjustment data. Question: 1. What should be included in the preparation of this project? 2. Analyze the main causes of quality problems of cement stabilized gravel base construction. 3. The construction requirements of asphalt concrete in winter are summarized in combination with this project. 4. Does the project department have sufficient basis for self-inspection of asphalt concrete surface layer? If not sufficient, should also add what? Reference: 1. Prepared construction organization design (1 point), familiar with design docume

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档