一建笔记(A building of notes).docVIP

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一建笔记(A building of notes)

一建笔记(A building of notes) 2014.7.2 Blow out medium 1. The nominal diameter is greater than or equal to 600 liquid gases. 2. The nominal diameter is less than 600 liquid water cleaning 3. The nominal diameter is less than 600 gas air cleaning. 06:48 Steam pipe is cleaned with steam. 5. Non-thermal piping shall not be cleaned by steam. General rules for blowing 1. The pipeline pressure test is qualified, and the construction unit is organized to blow wash and make up the cleaning plan. 2. Check pipe branches and hangers and do not allow the cleaning equipment to be isolated. 3, valves in pipeline pressure test dont participate in the purge, purge valve to protect it, before the former does not install the orifice plate, flange connection purge of important valve, throttle valve, regulating valve, safety valve, instrument, welding, instrument should be flowing through the bypass valve fire off valve head seat family cases. 4. Sequence director, branch pipe, pipe line. Pipeline pressure test 1 \ 1. The pressure test of the pipe shall be in heat treatment, after non-destructive testing, hydraulic or air pressure test, which cannot be done by hydraulic pressure. Brittle materials do not do air pressure test. Hydraulic pressure test 1. Clean water is medium and chlorine ion in water is less than 25ppm 2, the temperature is not lower than 5 °, higher than the corresponding transformation temperature of metal material, it is strictly prohibited to material test temperature close to brittle transition temperature. 3. 1.5 times the design pressure of steel or non-ferrous metal piping, not less than 0.4 Mp. 4. Test pressure for 10 minutes, descend to design pressure for 30 minutes, no leakage, no pressure. 5. No pressure handling. Pressure test 1. Air or inert gases are non-toxic, non-flammable, and dry gases. The pressure test was 1.15 times the design pressure. Before the experiment, the experiment should be carried out in air, and the pressure was 0, 2 Mp 3, test pressure ro

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档