- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一通三防隐患分析(An analysis of three hidden dangers)
一通三防隐患分析(An analysis of three hidden dangers)
Review opinions
1. According to the provincial bureaus optimization and development layout, reasonable concentration of production requirements, combined with the requirements of fire prevention work, reasonably arrange the excavation layout, and ensure the stable and reliable ventilation system of the mine.
2, under the current mining 3, 12 under the coal dust explosion index is higher, to implement according to the requirement of the six to carry out the coal seam water injection, blasting used water cannon mud, spray water and so on comprehensive dust control measures.
3, in order to ensure the normal production of full-mechanized caving mining face, we will strictly implement according to the requirement of the six to carry out the good goaf filling inert gas, two lane air stopping air leakage blocking, comprehensive monitoring and equalizing tube artificial ventilation of comprehensive fire prevention measures.
To seriously implement the jujube coal mass [2010] no. 32 on the organization to carry out the city coal mine three big disaster expert analysis activity notice spirit, serious drain of henan luoyang yichuan county national coal co., LTD., 3.31 accident of coal and gas outburst, a solid mine on the three prevention safety work, to ensure the mine safety production, the jujube mining group, yankuang group, shanxi datong university, shandong university of science and technology and other links, under the guidance of experts, combined with the mining plan in 2010, on April 16, 2010 I mine group led by chief engineer of engineering and technical personnel, on I mine on the three prevention hidden dangers are analyzed, put forward the prevention measures, and points out the focus and difficult problem in the future. The hidden trouble analysis and control measures are reported as below.
I. mine profile
The mine USES a pair of vertical well, the diameter of the shaft is 5m, and the development level is -700m, and t
您可能关注的文档
- 东财《建设工程法规及相关知识》在线作业三(Dongcai construction engineering regulations and related knowledge online job 3).doc
- 东风7G型内燃机处理故障(The east wind 7G internal combustion engine malfunctions).doc
- 东财施工技术作业(Dongcai construction technical operation).doc
- 八下word(Under the eight word).doc
- 八大宝典五大事项打造温馨家居(The five major events of the eight great books create a warm home).doc
- 八年级期末考试题3(Eighth grade final exam question 3).doc
- 八年级期末考试题1(The final exam of grade 8).doc
- 公交公司驾驶员安全行车演讲稿(Bus company driver safety driving speech).doc
- 公共基础_中国地理知识_(电子书)(Public base _ Chinese geography knowledge _ (e-book)).doc
- 公共场所无线网络安全与应对策略(Wireless network security and coping strategies in public places).doc
最近下载
- 标准的个人简历表格[空白].doc VIP
- 开放系统11879《小学语文教学研究》期末机考真题及答案(第102套).docx VIP
- 2025年新教科版科学四年级下册全册知识点(超全版).pdf
- 《sm-3酶标仪说明书》.doc VIP
- 3篇《严禁违规操办“升学宴廉政承诺书》谈话记录.docx VIP
- 2025中国工商银行软件开发中心社会招聘笔试备考题库及答案解析.docx VIP
- 老年常见病的预防与照护教学大纲.docx
- 六年级科学上册(教科版)全册同步练习(含答案).pdf VIP
- 2025年新人教版七年级下册历史全册知识点(新教材).pdf VIP
- 基于项目式学习的初中生物综合实践活动案例论文.docx
文档评论(0)