- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土木工程施工练习题(Work practice problems in civil engineering)
土木工程施工练习题(Work practice problems in civil engineering)
1. Earthwork engineering
2. The precipitation depth of jet well points can reach (8-20m).
32. When the permeability coefficient of the soil layer is 5m/d, and the precipitation depth is required to be 5 meters, the optimum method for the well point precipitation is ().
55. The methods of filling soil compaction mainly include, and vibration compaction.
59. The construction process of the bolt includes excavation, positioning, drilling, pulling rod, grouting, tensioning and anchoring.
64. The construction flow of soil nailing support is divided into positioning, drilling rig in place, and the steel mesh of safety layer and shotcrete.
62. The method of sand flow control mainly includes the excavation method, the excavation of the dry water season and the underground continuous wall method.
93. The factors that affect the quality of filling compaction are mainly, and the compaction work.
94. In the case of foundation pit precipitation with the precipitation method of collecting water pit, it is easy to produce sand flow phenomenon for fine sand and soil layers.
6. What are the basic principles of soil allocation?
13. Briefly describe the factors that should be considered in determining the elevation of site formation
21. What are the main measures to prevent the damage to neighboring buildings?
23. Specific measures for the prevention and control of flow sand
32. Brief description of the basic requirements of earthfill
Ii. Basic engineering
13. When the concrete precast pile is sunk by hammering method, it is timely ().
The concrete strength of the prefabricated pile should reach the design strength when the pile starts piling.
42. When prefabricated pile of reinforced concrete pile is prefabricated, the stack layer should not exceed ().
48. In the construction of the mud retaining wall, the mud level is higher than the underground water level in order to make the mud work.
56. Common methods of foundation pit supp
您可能关注的文档
- 创业计划书1(Business plan 1).doc
- 创新发明与专利实务(Innovative invention and patent practice).doc
- 创新思维训练课后习题答案(Innovative thinking training exercises after class).doc
- 创维gled彩电故障处理技巧(Skyworth gled color power failure handling technique).doc
- 创维彩电内部资料1(Create the internal information 1).doc
- 创业故事身后的成功之路(The road to success behind a startup story).doc
- 初 中 数 学 口 诀(The first number of learning tips).doc
- 初一作文环保倡议书(First composition environmental initiative).doc
- 分类文库(Classification of library).doc
- 初一生词本2(The first new word Ben 2).doc
- 土木工程类核心期刊汇总(Summary of core journals of civil engineering).doc
- 土木工程专业英语精华(English essence of civil engineering).doc
- 土石方说明(Description of earthwork).doc
- 圣元战略部署(Strategic deployment of the holy yuan).doc
- 土地信息学(Land informatics).doc
- 圣斗士星矢目录(Saint seiya catalog).doc
- 圣詹姆斯公园(St James's park).doc
- 在excel中使用vba代码选择区域(Use the vba code selection area in excel).doc
- 在全县农网二期改造总结表彰暨县城电网改造动员大会上…(In the second phase of the county agricultural network reconstruction summary and the county grid transformation mobilization meeting...).doc
- 在厦门混,你不得不知道的100件事(In xiamen, you have to know 100 things).doc
文档评论(0)