土石方说明(Description of earthwork).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土石方说明(Description of earthwork)

土石方说明(Description of earthwork) Said Ming First, general descriptions 1. Classification of soil and rocks, see the classification of soil and rocks.  2. The volume of soil and rock is prepared according to the natural density volume.  3. The division of dry and wet soil is divided into underground water level, and the above water level is dry soil and wet soil below; The moisture content is less than 25% for the dry soil, and the water content of 25% is wet soil. If the underground water table is artificially lowered, the water level shall prevail.  4. Silt refers to the soil, such as ponds, swamps, paddy fields and ditch pits, which are fluid or soft. The silt is the sandy silt with sticky silt and non-adhesive tools. The flow sand refers to the silty sandy soil and subsoil that are flowing in the water due to the influence of groundwater. The soil is unrolled and accumulated for no more than a year.  5. This chapter does not include the cost of drainage for the construction of groundwater, and shall be calculated in real terms.  6. The artificial and mechanical earthwork items are considered by different soil categories, and the actual soil categories are not adjusted at the same time. 7. Flat field means the local digging, filling and leveling of the thickness within or below 300mm; When the vertical layout is excavated and filled with earthwork, the project will not be calculated.  8. The stone square blasting project is prepared according to the loose blasting, and the quota is carried out according to the light gun and smoggy gun. Smoggy cover material costs are calculated in real terms.  9. The charge of detonator and explosives shall be calculated in real terms.  10. Excavate silt, flow sand, regardless of foundation, groove (foundation pit), all carry out this quota.  11. When it is shipped, only the corresponding transport items are calculated.  Second, the artificial conditions  1. The artificial soil project is prepared according to the dry

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档