- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
UMC Foundry service flow课件
The Introduction of UMC Foundry
Process Service Flow;IC Design(IC 設計): 聯發, 威盛, 鈺創, 瑞昱……
Wafer Production(晶圓製造):
Foundry: UMC, TSMC, Chartered...
IDM: Intel, Winbond, Macronix…..
DRAM: Micorn, ProMOS, Nanya, 力晶…...
Wafer Packaging(晶圓封裝): 矽品, 日月光…..
Wafer Testing(晶圓測試): 矽豐, 京元, 福雷, 聯測…..;Outline;1. The Family of UMC Global Foundry Factory;2. Foundry Production Flow;3. Order + Production Plan;3.1 The Workflow of Order Confirmation;;3.1.2 The Sample screen of Order Entry;3.1.3 Output Sample from ATP;3.2 The Application System of Production Plan in Notes;3.2.1 The Daily Workflow of Production Plan;3.2.2 Product Spec. System;3.2.3 Wafer Start Sheet System;3.2.4 晶片下線(Wafer Start)計劃表;3.2.5 IQA 進料檢驗 System;3.2.6 Mask(光罩) Tracking;3.2.7 New Pilot Run System;Demand
Collaboration;Instant time-optimized (confirmed best delivery date) response to customers requests for POs and order changes
Wafer start queue time reduced from weeks to days
Order confirmation time reduced from days to minutes
Demand fulfillment from frontend ATP integrated with backend CTP (Capable to Promise)
B2B electronic interface eliminating administrative process steps
Forecast/Demand/Fulfillment Collaboration
Dynamic interaction for violations of specific rules of engagement
Alert system for ATP changes or commitment changes;4. Front End Production;;;Stage 1: “Pilot Run” Stage
This stage begins with the first lot of customer’s new product is started. CE initiate the pilot run request to PEI.
Customer’s product in this stage is not verified at all
Stage 2: “Pre-Production” Stage or called “Risk Run”
When wafers started of one customer product has exceeded 75 pcs or customer is given future order with more than 75 pieces of wafer. Then PP will initiate the request if the product can be released for pre-production.
Customer’s product in this stage is in small volume production but verification on product in not fully completed.
Stage 3: “Mass Production” Stage
When W/O 500 pcs or having 10 lots stable yie
您可能关注的文档
- topic 1 chemistry课件.ppt
- Topic03-Decrease-and-Conquer课件.ppt
- topic 2-health课件.ppt
- TOPIC5 InternationalFreightLogistics-2013-SIFT课件.ppt
- Topic_04_behavioral_Synthesis_08课件.ppt
- topic-purpose-central idea课件.ppt
- Towards a Municipal Waste Strategy for Newcastle Council2005 - 2025课件.ppt
- Toxicology in Drug Developments课件.ppt
- tounge twisters寸丽元课件.ppt
- top_ten_automation课件.ppt
最近下载
- 中国山水画中的道家美学.doc VIP
- 人文关怀的护理课件最新完整版本.pptx VIP
- 基于Unity3D C#语言的防范疫情的游戏设计与制作.doc VIP
- 部编版七年级语文上册、下册全册教案(全册教学设计).docx VIP
- 智能电气设计EPLAN 第2版 课件 项目五 任务三 热过载继电器部件制作.pptx
- 梅特勒pH计FE28说明书.pdf VIP
- 第四纪地质与地貌学_第三章_第四纪基本问题_3-第四纪气候分解.ppt
- 江苏省南京市2024-2025学年高一下学期6月期末考试语文试题(含答案).doc VIP
- 《中等数学增刊1-2018》.doc VIP
- 银行利率定价管理委员会工作制度.docx
文档评论(0)