- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
软件工程模型(Software engineering model)
软件工程模型(Software engineering model)
What are the advantages and disadvantages of the V model developed by software?
The V model is the most well known testing model.
The most typical version of the V model will describe the software development process in its initial part
Figure 1 development stages of the V model
This is the ancient waterfall model. As development model,
In the V model, the testing process is added to the second half of the development process, as shown in the following figure:
Fig. 2 Schematic diagram of V model
Does the development of the test code for the unit test meet the requirements of the detailed design?. Integration testing detects whether components of the previous test can be properly integrated. System tests check whether the products that are integrated together meet the requirements of the system specifications. The acceptance test determines whether the product meets the requirements of the end user.
Pre acceptance test
Feasibility Analysis acceptance test
A general pre test system
Demand analysis system test
A general pre integrated test
The outline design of integration test
A general pre unit test
The detailed design of unit test
General
Code
This is the V model for software testing
Defects in the V model
Just take the testing process as a phase after requirements analysis, system design, and coding
Ignoring the tests, validation of the requirements analysis, and system design until the late acceptance tests were found.
W model:
Last time, the limitations of the V model lie in the absence of a clear indication of early testing and the failure to embody the principle of software testing as early as possible. In the V model, the software should be tested simultaneously in each development phase and evolved into a W model. In the model, it is easy to see that development is V, and the test is V in parallel with this. Based on the principle of software testing as early as possible and continuously, the testing activities in the so
您可能关注的文档
- 组胚重点整理(Embryo arrangement).doc
- 线性规划护士排班分析模型(The linear programming model of nurse scheduling).doc
- 细胞的能量通货(Cellular energy currency).doc
- 细长轴的加工(Machining of slender shafts).doc
- 织造学下文档(Documentation for weaving).doc
- 织物丝印的定位及套准知识介绍(Introduction to localization and registration knowledge of fabric silk screen).doc
- 终端三级跳渠道、促销、服务三点联动(Terminal three jump channel, promotion, service three point linkage).doc
- 绍兴县部分工业龙头企业展示(Part of the industrial enterprises in Shaoxing County show).doc
- 织造机械复习题(Review of weaving machinery).doc
- 维修保养计划工程部、搜索zl(Maintenance planning, engineering department, searching for ZL).doc
最近下载
- 成都市金牛区2020-2021学年下学期一年级期末考试语文试卷(部编版).pdf VIP
- 儿科“一科一品”之做有温度的护理人.pptx VIP
- 2025年广州数学中考试题及答案.doc VIP
- 中文释义 PASS图解速记高中词汇正序版.xlsx VIP
- 辅警招聘考试公安基础知识(情景分析题)模拟试卷3(题后含答案及解析).pdf VIP
- 工程质量风险分级管控清单 .pdf VIP
- 生物医学工程先进制造:第一章 绪论-2015.ppt VIP
- 培养员工归属感培养员工归属感.ppt VIP
- 古方上篇后八方.张志峰老师讲解和答疑2016.3.5.doc VIP
- JingChaDaXue《灭火救援指挥》期末试卷(A)参考答案.docx VIP
文档评论(0)