预制外墙板安装工艺标准(Standard for installation of precast exterior wall panels).doc

预制外墙板安装工艺标准(Standard for installation of precast exterior wall panels).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
预制外墙板安装工艺标准(Standard for installation of precast exterior wall panels)

预制外墙板安装工艺标准(Standard for installation of precast exterior wall panels) 1 range The process standard is applicable to the installation of exterior plate internal mold structure and precast external wall board. 22 construction preparation 2.1 materials and main equipment: 2.1.1 exterior panel: after entering, check the model, geometry size and appearance quality should comply with the design requirements. Horizontal cavity and vertical cavity waterproof structure integrity. Component shall have factory certificate. 2.1.2 joint waterproof insulation material: plastic strip (thickness 1.5 ~ 2mm), linoleum, polystyrene board. 2.1.3 other materials: cement, sand, welding, steel, steel plate, 107 glue, waterproof paint and sealant etc.. 2.1.4 main tools: wire rope sling and clasp, crowbar, steel plate, temporary fixing clamps and wire etc.. 2.2 operating conditions: 2.2.1 familiar with design drawings, grasp the exterior panel model, location, size, elevation and structural practices. 2.2.2 check the wall board waterproof cavity should be intact anyway, if damaged should be repaired, repair should be basic clean, with cement mortar mixing 107 glue (cement weight 15%) repair. 2.2.3 will be on both sides of the outer wall of the anchor steel collar gouge out, adjust the flat, tick should not damage the ring near the concrete, and then in the vertical waterproof cavity painted waterproof paint. 2.2.4 check the wall plate installation position line and elevation line, pre finishing. 2.2.5 install the inner wall large formwork and the outer platform bayonet shelf. 2.2.6 check the first floor concrete stop and the reserved tendon position. 3 operation process Felt insert, Polyphenyl bar, Plastic strip 3.1 process: Exterior wall board Temporary fixation Apply leveling layer to exterior wall board Insertion node Constructional reinforcement Key reinforcement welding, Cast concrete Bottom plate twist Dry hard cement mortar Remove the exterior panel Temporary support I. 3.2, levelin

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档