挖土方计算放坡系数(Excavation slope coefficient calculation).docVIP

挖土方计算放坡系数(Excavation slope coefficient calculation).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
挖土方计算放坡系数(Excavation slope coefficient calculation)

挖土方计算放坡系数(Excavation slope coefficient calculation) Calculation of slope coefficient by digging earthwork I. design phase 1., for large residential areas, as far as possible combined with the original topography, reduce earthwork excavation, sinotrans. Especially in the land with high relief, it is best to combine the original topography to design elevation of the whole project in the planning and design stage, so as to minimize the excavation of earthwork and the volume of Sinotrans projects. 2. according to the existing geological data to determine the foundation pit or trench slope coefficient for sub contract to provide technical support and site construction. At present, the quantity of earthwork in the bill of quantities is mostly provisional, which brings uncertainty to the cost prediction, and also brings some difficulties to cost control. Two, tender stage 1., under the conditions permit, as far as possible the use of earthwork lump sum approach. If the total amount of earthwork is settled, the risk of the increase and decrease of earthwork quantity shall be borne by both parties. If the earthwork quantity is tentative, a lot of uncertain factors will be added, such as the determination of the slope coefficient, the elevation of the earthwork before and after excavation, the accuracy and error of the measurement, and the uncertainty of the dynamic control of the cost. 2. in the terms of the contract, specify the responsibility for the change of earthwork (elevation) before and after the transfer of the main package site. In the main contract if including the foundation backfill after extra earthwork Sinotrans engineering, construction site in the main package units will be handed over to the outdoor unit before elevation measurement, main contractor accept site and the site will be handed over to the outdoor unit of surplus earth before the main contractor responsible for Sinotrans, if the outdoor unit at (when the outdoor unit price contract price is highe

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档