2012年11月_助理人力资源管理师(三级)考试题及答案 2(In November 2012 _ assistant human resources management (level three) exam questions and answers 2).doc

2012年11月_助理人力资源管理师(三级)考试题及答案 2(In November 2012 _ assistant human resources management (level three) exam questions and answers 2).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2012年11月_助理人力资源管理师(三级)考试题及答案 2(In November 2012 _ assistant human resources management (level three) exam questions and answers 2)

2012年11月_助理人力资源管理师(三级)考试题及答案 2(In November 2012 _ assistant human resources management (level three) exam questions and answers 2) November 2012 assistant human resources management (national occupation qualification level three) exam skill test ? a, short answer (the total of 2 questions, each question 15 points, a total of 30 points) 1? Please briefly explain the design method of enterprise salary bonus adjustment scheme. (15 points) 2,? A brief description of collective contract procedures. (15 points) Two, the calculation (1 questions, a total of 18 points. The first problem according to the calculation, and then make the necessary analysis, only the results without calculation does not score) Printing a printing company under the purchase of 25 sets of C type digital printing equipment. Due to the supplier to provide quota information is not complete, the leaders of the Ministry of human resources in the shortest time, proposed scheme of this kind of equipment. The evaluation team, so the human resources department is responsible for the formation of the first to have trial run of five sets of equipment to conduct a comprehensive determination, through work on realism, found this kind of equipment custody post has three operating points, a point of the working time is 300 centimeters, B point working time is 220 points, point C time is 280 centimeters, based on past experience, this kind of equipments personal needs and rest time is 60 centimeters wide. In addition, according to the plan in 2009, this kind of equipment each need to use 2 flights, to meet the needs of production tasks. The average attendance known over the past 3 years, the plant staff rate of 96%. Please according to the above information: (1)?? calculate each device quota in charge (person / Taiwan) (8 points). (2)?? a number of accounting personnel in 2009 this kind of equipment. (10 points) Three, comprehensive problems (the total of 3 questions, first items 16, second class 18, third class

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档