2012年二级建造师《水利水电》辅导资料(二)(2012 two construction division water conservancy and Hydropower guidance materials (two)).docVIP

2012年二级建造师《水利水电》辅导资料(二)(2012 two construction division water conservancy and Hydropower guidance materials (two)).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2012年二级建造师《水利水电》辅导资料(二)(2012 two construction division water conservancy and Hydropower guidance materials (two))

2012年二级建造师《水利水电》辅导资料(二)(2012 two construction division water conservancy and Hydropower guidance materials (two)) In 2012 two construction division of water conservancy and Hydropower counseling information: (two) The first chapter of construction diversion The 1. key and difficult content Understand the construction diversion in water conservancy and hydropower project construction in the special position and role, grasp the basic mode of construction diversion, understand the main factors influencing the way of diversion, diversion time division understanding, understand diversion design standard and design of diversion flow, understanding flow project layout and hydraulic calculation, understand the comparison and selection of diversion scheme. Understand the cofferdam layout and crest elevation method to determine the basic application type cofferdam cofferdam; many forms, mainly applicable conditions and master cofferdam concrete cofferdam, structure and layout. The relationship between closure and cofferdam closely, but due to closure in the construction plays an important role in guiding, and is one of the main control project construction schedule, the main should grasp the main problems and design of vertical blocking closure method. After the closure cofferdam breath, to begin to foundation pit drainage, drainage, can create dry construction conditions, should grasp the main layout and calculation of the initial drainage and frequent drainage, and drainage for the Ming dynasty. 2. the concept of construction diversion. Generally speaking is to take guide, cut, blocking, storage and discharge and other construction measures, the river flows in all or part of the safety oriented downstream, or storing up, to ensure that the hub of the main building in dry land construction. This is in the process of construction of water control, traditionally known as the construction diversion. The construction diversion project throughout the whole process of construction

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档