- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
测试题2(Test 2)
测试题2(Test 2)
First, determine the problem
1. the purpose of software testing is to find software defects as much. (Y)
2.Beta test is an acceptance test. (Y)
3. the acceptance test is implemented by the end user. (N)
4. before the project test personnel do not need to submit any work. (Y)
5. unit tests can find software defects about 80%. (Y)
6. code review is to examine whether the source code to achieve the module design requirements. (N)
7. bottom-up integration requires the tester to write driver. (Y)
8. load test is to test the ability of verification system up to what extent. (N)
9. test personnel should adhere to the principle of repairing defects not determined not by end. (N)
10. judges by the testers as general code. (N)
11. we can artificially make the software configuration problem does not exist. (N)
12. integration test plan in the needs analysis phase of late submission. (N)
Two, choose
1. software acceptance test pass criteria: (ABCD)
All the functions defined in the specification has been fully achieved A. software requirement analysis, performance indexes meet the requirements.
B. all the test items without residual level, two level and three level error.
C. examination and approval form, needs analysis document, design document and encoding implementation.
The complete D. acceptance test.
2. software test plan review will need what personnel to attend? (ABCD)
A. Project Manager
The person in charge of B.SQA
The person in charge of the C. configuration
D. test group
3. the following is right on the alpha test description: (AD)
The A.alpha test requires the user representatives
B.alpha does not require the user representatives to participate in the test
C.alpha test is a test of the system
D.alpha test is an acceptance test
4. test designer responsibilities: (BC)
A. test plan
B. test case design
The C. design process, test script
D. test and evaluation activities
5. software implementation activities into the criteria: (ABC)
A. has been the baseline
您可能关注的文档
- 江苏省高等教育2010年4月自学考试27877市场营销试题及答案(Jiangsu higher education April 2010 self taught examination 27877 marketing examination questions and answers).doc
- 江门应当打造什么样的明星民企管理(What kind of star private enterprise management should be created in Jiangmen).doc
- 汤姆·克鲁斯(Tom Curise).doc
- 汽车地盘实训(The automobile training site).doc
- 汽机检修现象(Turbine repair phenomenon).doc
- 汽车底盘构造与维修实训总结(The chassis structure and maintenance training summary).doc
- 汪峰歌词(Wang Feng lyrics).doc
- 汽车引领文明(Leading car civilization).doc
- 汽车技术服务与营销专业专业介绍(Automobile technology service and marketing professional introduction).doc
- 汽车技术服务与营销(Automobile technology service and marketing).doc
- 测量专项施工方案(Measuring special construction plan).doc
- 测量学课后习题及答案(Surveying exercises and answers after school).doc
- 济南2012人力资源(Ji'nan 2012 human resources).doc
- 测距程序(Ranging program).doc
- 测量人员岗位责任1-百度文库(Surveying personnel responsibilities 1- Baidu Library).doc
- 济南人力资源现状(The current situation of human resources in Ji'nan).doc
- 浅谈锚在船舶操纵中的应用方法(Study on the anchor applied in ship handling in).doc
- 济南人力资源(Ji'nan human resources).doc
- 测绘制度(Surveying and mapping system).doc
- 济南市发展散装水泥管理规定(Provisions on the administration of bulk cement development in Ji'nan).doc
文档评论(0)