第二章施工过程组织原理(The second chapter of the construction organization principle)
第二章施工过程组织原理(The second chapter of the construction organization principle)
The second chapter of the construction organization principle
The first section of the construction process of organization principle
The construction process
Natural process
Labor process
Concrete curing
Asphalt pavement forming
The construction preparation process
The basic construction process
The auxiliary construction process
The construction of the service process
Division of the construction process:
1.: construction preparation process refers to the products in the production of all pre production
Technical preparations;
2. basic construction process: refers directly to the finished product and the production activities;
The 3. auxiliary construction process: refers to ensure the normal construction process of the basic
All kinds of auxiliary production activities required;
4. construction service process: refers to all kinds of basic construction and auxiliary construction services.
Business process.
1 operation and operation:
Action: workers once completed in labor when the most basic activities.
Operation: a number of interrelated actions operation. Complete an action using time and space is critical to develop data quota.
A highway construction process
The 2 step:
Refers to the labor organization can not be separated, the construction technology of the construction process of the same. It is composed of a plurality of operating components. The construction organization often takes the process for the object. The cushion, the grass surface.
The place of work, construction tools, construction machinery and materials does not change!
3 construction section:
It is composed of several technically interrelated processes, a detailed engineering relatively independently. Such as: roadbed, road and bridge.
4 comprehensive process:
Is a number in the product structure in close contact, the sum can be a product of the construction process. Such as: route engineering.
Three organizing princip
您可能关注的文档
- 研发管理10大典型问题(The typical problem of R & D management 10).doc
- 研发循环法语(French development cycle).doc
- 研发质量控制与改进(Research of quality control and improvement).doc
- 研发项目管理(上海-北京-深圳-杭州-深圳-厦门)(Project management (Shanghai - Beijing - Shenzhen - Hangzhou - Shenzhen - Xiamen)).doc
- 研发部工作计划及总结(The R & D department work plan and summary).doc
- 研发项目管理实战(Research of project management practice).doc
- 研发项目管理与敏捷化开发(Project management and agile development).doc
- 研发项目管理讲师周水根《从样机走向量产-中试规划与管理》(Project Management Lecturer Zhou Shuigen from the prototype to test the planning and management of production -).doc
- 研发项目管理讲师周水根《情景式研发项目管理高级实战》(Project Management Lecturer Zhou Shuigen situational research project management advanced combat).doc
- 研发项目管理讲师周水根《流程设计与优化》(Design and optimization of R & D Project Management Lecturer Zhou Shuigen procedure).doc
文档评论(0)