第十一章水电改造秘笈(The eleventh chapter Hydropower transformation tips).docVIP

第十一章水电改造秘笈(The eleventh chapter Hydropower transformation tips).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第十一章水电改造秘笈(The eleventh chapter Hydropower transformation tips)

第十一章水电改造秘笈(The eleventh chapter Hydropower transformation tips) The eleventh chapter: Hydropower transformation tips Basic principles: first, safe and convenient life, meet the basic use function 1, the guerrillas of hydropower construction risk is very large, often received complaints online. Such as zero, ground, run frequently, anti tripping wall, charged water overflows golden hill and so on, after the problems of construction personnel is the disappearance of the Not the least trace was found. 2, the owners must consider where to put what appliances? Water tank, washing machine, cabinet is blocked socket which can not be used? The details of things may not be detailed in the drawings, so you need more consideration early. The construction proposal is only for reference, the design of hydropower fully listen to others will have a serious cost overruns, their basic concepts, such as the switch shift may need only 20 cm, because there are not joint tube, to change the whole line, so the shift will result in 20 cm 10-20 meters of the project, so that the switch is less move or not move, appearance and investment proportion should not blindly pursuit of beauty. The line side does not affect the use function. And as the frequency of use ceiling lamp is very low, there is no need to control the 2-3 cloth line? Switch too much so that you can not find the north. Hydropower should be designed according to the drawings, accurate positioning. The design should show the effects of change. Start before the estimated total cost of error is less than 10%, confirmed by the owner before construction. Hydropower is high risk and high profit, if no control is a bottomless pit, and practical suggestions for enough principle, not the pursuit of all extravagance and waste, according to the use frequency decided to invest. But the proposed hydropower material with excellent quality products, it is related to the long period of stability, it is necessary to spend more money. 3, it is

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档