- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
厨房设备施工工艺(The construction technology of kitchen equipment)
厨房设备施工工艺(The construction technology of kitchen equipment)
Kitchen equipment construction technology
Release time: 2010-11-16 belongs to category: decoration process
Kitchen equipment installation
(1) construction process flow;
Wall and floor base treatment, install the product inspection and installation to install bottom cabinet to connect the cabinet for water supply and drainage installation, debugging, testing and adjustment of electrical equipment cleaning.
(two) construction essentials
Inspection prior to installation of kitchen equipment.
The cabinet should be installed according to different wall using different fixation methods.
Bottom cabinet installation should first adjust the horizontal knob, to ensure that each cabinet surface, front face are in a horizontal plane, two cabinets connected to use wood screws, the back plate, through the pipeline, table, valve, etc., should be crossed in the backplane punch.
Install the bottom of the bottom of the washing cabinet and add plastic round cushion. The connection of the sewer pipe shall ensure no leakage and water seepage, and shall not use any kind of adhesive to connect the interface part.
When installing the stainless steel sink, make sure that the gap between the tank and the table is uniform and water tight.
The installation of water faucet, requires firm installation, Sheung Shui connection can not appear seepage phenomenon.
Smoke lampblack machine installation, pay attention to cooperate with condole extractor hood size should be coordinately.
The installation of the stove must not leak. After installation, use soap foam to check whether it is well installed
Installation principles for indoor gas pipelines
Indoor gas pipelines should be mainly laid on the surface. The gas pipe shall be laid along the non combustible material wall, and shall meet the following requirements when meeting with other piping:
(1) when horizontal parallel laying, the net distance shall not be less than 150mm;
(2) when vertica
您可能关注的文档
- 振动与波动练习题.doc
- 振动与波动要点习题(xin).doc
- 振动与波动选择题.doc
- 振动危害.doc
- 振动和波动自测题.doc
- 挽救文档.doc
- 换位思考_和人为善wxt.ppt
- 授权和受权方法收权和回权重要.doc
- 排列、组合基本知识.doc
- 排列和组合(教师).doc
- 数据仓库:Redshift:Redshift与BI工具集成.docx
- 数据仓库:Redshift:数据仓库原理与设计.docx
- 数据仓库:Snowflake:数据仓库成本控制与Snowflake定价策略.docx
- 大数据基础:大数据概述:大数据处理框架MapReduce.docx
- 实时计算:GoogleDataflow服务架构解析.docx
- 分布式存储系统:HDFS与MapReduce集成教程.docx
- 实时计算:Azure Stream Analytics:数据流窗口与聚合操作.docx
- 实时计算:Kafka Streams:Kafka Streams架构与原理.docx
- 实时计算:Kafka Streams:Kafka Streams连接器开发与使用.docx
- 数据仓库:BigQuery:BigQuery数据分区与索引优化.docx
文档评论(0)