15春西交《发电厂电气部分(高起专)》在线作业 满分答案(15, spring West to power plant electrical parts (high starting special) online homework, out of the answer).docVIP
- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
15春西交《发电厂电气部分(高起专)》在线作业 满分答案(15, spring West to power plant electrical parts (high starting special) online homework, out of the answer)
15春西交《发电厂电气部分(高起专)》在线作业 满分答案(15, spring West to power plant electrical parts (high starting special) online homework, out of the answer)
Austrian Peng 15 spring West to the power plant electrical parts (high starting special) online homework
Total score: 100 test time: -
Radio examination
A multiple-choice question
Judgment question
Radio examination questions (22 questions, 66 points)
1., the most effective way to reduce the stress of the rectangular bus is ()
A. change the layout of the bus
B. increase the bus cross section
C. reduces the distance between two adjacent insulators in the same phase
D. increases the bus spacing
Full marks: 3
2. three-phase three column voltage transformers can be used to measure ()
A. line voltage
B. phase voltage
C. zero sequence voltage
D. negative sequence voltage
Full marks: 3
3. insulating oil in less oil circuit breaker ()
A. arc extinguishing medium and cooling medium
B. arc extinguishing medium and contact gap insulating medium
C. arc extinguishing medium, and the contact gap, the insulating medium between the charged part and the ground
D. or more is wrong
Full marks: 3
4. what is incorrect about the switch is that
A. reliably connects or disconnects the circuit under normal conditions
B. switches when it changes its mode of operation
C. when the system fails, quickly remove the fault section to ensure the normal operation of the non fault part
D. plays a role in bringing together and distributing current in an electric power system
Full marks: 3
The rate of power consumption in 5. plants is one of the main indexes to measure the economic performance of power plants. It is equal to the power consumption of the power plant in a given period of time
A. the ratio of its total power generation
B. total installed capacity ratio
C. the ratio of its power supply
D. system total power generation ratio
Full marks: 3
6. in power system, series reactors are mainly used ()
A. limits short-circuit current at fault
Capacitive reactive pow
您可能关注的文档
- 南京大行宫路面坍塌一辆公交车沉到了地下(Nanjing Palace Road collapse a bus sank to the ground).doc
- 南京航空航天大学复试内容(Nanjing University of Aeronautics & Astronautics retest content).doc
- 南开13秋学期《高级成本会计》在线作业(Nankai 13 fall semester senior cost accounting online homework).doc
- 南浔+无锡(Nanxun + Wuxi).doc
- 南海争议个人看法(The South China Sea dispute personal views).doc
- 南海(South China Sea).doc
- 南航 测试计量技术及仪器 考研(The southern section of measurement technology and instruments).doc
- 南药王牙膏功效成分介绍(The South King toothpaste ingredients introduced).doc
- 南通婚事习俗(The marriage custom in Nantong).doc
- 南靖县梅林镇概况(The general situation of Nanjing County town of Merlin).doc
最近下载
- 院感知识试题(附答案).docx VIP
- 分布式光伏电站屋顶租赁协议(标准范本).docx
- 高温防暑安全培训课件.pptx VIP
- 11SG534带水平段钢斜梯(45°)(OCR).pdf VIP
- 一升二数学《暑假作业》 每日一练.docx VIP
- 《商务-谈判》课程标准).doc VIP
- 对我国长距离浆体管道输送工程设计的思考-论文发表.PDF VIP
- 110(66)kV~500kV架空输电线路运行规范.ppt VIP
- 牛津译林版九年级上册英语Unit 1-Unit 8语法知识点复习提纲.pdf VIP
- 《GBT20001.3-2015标准编写规则第3部分:分类标准》(2025版)深度解析.pptx
文档评论(0)