2013.6二建建筑实务答案(Answer 2013.6 No.2 construction practice)
2013.6二建建筑实务答案(Answer 2013.6 No.2 construction practice)
Erjian construction practice:
1 overhanging space -- upper part
2 about building engineering - the final setting time of cement
3, in general, pull
4 Foundation Inspection - design unit project leader
5 about steel processing --HRB400
6 the following welding methods -- help bars
7 about ceiling Engineering - ceiling Engineering
8 unit construction - project technician
9 the following prestressing - first deep
10 a span of 6M-9d
11 during construction -4h
12 construction works +1, 2, 3
13 steel structure connection +C 2~3
14 all earthing protection of +B in construction site
15 responsible for +C project on construction site
16 about the construction site +D... Designated point
17 according to construction +C construction unit
18 according to the building +A unit project
19, according to the construction + enterprise security
20 according to mixing + water reducing agent
24 construction measures crack control + low hydration heat + heat preservation moisture
25 expert demonstration + climbing +25m suspension + height 50m
26 foundation pit completion + supervision + Design + reconnaissance + Construction
27 crane equipment acceptance + supervision + turnkey + installation
28 belongs to direct fee + artificial + material + construction machinery
29 building roof waterproof level + grade I + two fortification
30, according to the external wall metal window project + wind pressure + rain leakage + rear embedded parts
Case 1:
The 1 mistake is structural entity experiments should be in on-site supervision engineer, project manager and construction units by the implementation of organization, the correct approach is structural entity experiments should be in on-site supervision engineer, by the project construction unit professional quality (technical) responsible for the organization and implementation.
The 2 mistake is to masonry beam bottom and after 2 days of interval immediately to fill masonry squeezing, the cor
您可能关注的文档
- 参加pkpm学习班的笔记(In the PKPM class notes).doc
- 县市镇(County town).doc
- 参观实习心得(Visit the internship experience).doc
- 厦门市大型桥梁隧道管理办法(Measures for the administration of Xiamen large bridge tunnel).doc
- 叉车7(7 forklift).doc
- 叉车6(6 forklift).doc
- 叉车理论试卷 3(Forklift theoretical papers 3).doc
- 双向地震作用、偶然偏心(Bidirectional earthquake, accidental eccentricity).doc
- 双向地震和偶然偏心的选择(转)(Bidirectional earthquake and accidental eccentricity selection (RPM)).doc
- 双孢菇菌种(Agaricus mushroom).doc
最近下载
- 反应机理(研)-高等无机化学.ppt VIP
- 218SS-PKE 摩托车操作说明书.pdf
- 2025年高考甘肃卷物理真题.docx VIP
- 凯恩帝K1TBIII-A-As数控系统用户手册.pdf
- 杭州电子科技大学信息工程学院2025-2026学年《概率论与数理统计2》第一学期期末试题(B).docx VIP
- 第2章 有理数的运算(单元测试·培优卷)含答案-2024人教版七年级数学上册.pdf VIP
- 中考1600词汇对照表(英译汉).doc VIP
- 杭州电子科技大学2025-2026学年《概率论与数理统计2》第一学期期末试题(B).docx VIP
- 香农三大定理详解.ppt VIP
- 【初中物理】专项练习:物体的密度及其测定40题(附答案).pdf VIP
原创力文档

文档评论(0)