- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
3.地质作用(3. geological processes)
3.地质作用(3. geological processes)
Weathering: under surface conditions, the rock is subjected to atmospheric, water, biological and other factors, in place of mechanical disintegration or chemical decomposition, forming a loose accumulation process.
The measures to prevent rock weathering should be considered in two aspects: on the one hand, improve the integrity and strength of rocks, and improve the weathering resistance of rocks. General methods are: cement grouting, clay grouting, asphalt grouting and silicification, etc.. On the other hand, natural factors are prevented from invading rocks. Methods: the use of clay slurry, asphalt grout or cement grouting surface or underground cavern slope touch surface, closed bottom, to prevent rock surface in direct contact with air and water. The method of intercepting, discharging surface water and lowering ground water can also be used to reduce the weathering of water to rocks.
The geological processes of the river include three aspects: erosion, transport, and deposition.
River erosion is characterized by erosion, erosion, erosion, erosion and abrasion, and dissolution is secondary.
Direction: river erosion erosion: river mud, sand, gravel to carry tools and to force and dissolved their own rock and soil on the bottom of the riverbed and the riverbed erosion reducing effect is called inhibition. Lateral erosion: the river takes the mud, sand and gravel as tools, and erosion and erosion of rock and soil on its banks with its own momentum and dissolution force, which makes the river valley bend and widen
Four ways of handling: passage: the flow of sand, gravel, along the river bottom bed rolling, dragging and collision. Saltation: fine gravel and sand are primarily transported by leaps and bounds. Suspension: the smaller particles move in a suspended state. Dissolved transport: the river bed and transport of material, subject to chemical dissolution of water. Carried in a homogeneous solution in a river; carried away.
Type
您可能关注的文档
- 07 信号发生电路制作(07 signal generator circuit).doc
- 07.应急处理07-04-01(7 emergency response 07-04-01).doc
- 07年一级建筑师设计前期与场地设计知识讲义(07 years of architect design, preliminary and site design knowledge handouts).doc
- 07年12月英语四级原题(07 years in December, English four class original title).doc
- 07专业简答综合(07 professional comprehensive use).doc
- 07建筑设计标准规范(07 architectural design standards and specifications).doc
- 040401地心之旅-张少泉(040401 geocentric journey - Zhang Shaoquan).doc
- 08.2.动量定理(08.2. momentum theorem).doc
- 08基础大纲(08 basic syllabus).doc
- 08届高三数学直线的方程(The equation of the 08 high mathematics line).doc
- 300p代号及故障(300p code and fault).doc
- 30例临床总结(Clinical summary of 30 cases).doc
- 30民诉法之涉外仲裁(09年司考三大本分段学习)(30 the law of Arbitration (09 years and three big Scott subsection learning)).doc
- 30年最经典的30首华文歌曲(30 classic Chinese songs of 30 years).doc
- 31建筑方案设计(31 architectural design).doc
- 31液压动力爬模施工工艺标准(31 hydraulic power climbing formwork construction process standards).doc
- 31民法之商标权(09年司考三大本分段学习)(The trademark law 31 (09 years and three big Scott subsection learning)).doc
- 32-第十一章 城市维护建设税(32- eleventh chapter city maintenance construction tax).doc
- 32位寄存器(32 bit register).doc
- 32位cpu所含有的寄存器有(The registers contained in the 32 bit CPU are).doc
文档评论(0)