belliss 高压空压机操作保养制度(Belliss high pressure air compressor operation maintenance system).docVIP
- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
belliss 高压空压机操作保养制度(Belliss high pressure air compressor operation maintenance system)
belliss 高压空压机操作保养制度(Belliss high pressure air compressor operation maintenance system)
Operation and maintenance system of BELLISS high pressure air compressor
A: operating system
Operator requirements
As before any operation is responsible for control, operation and / or in the compressor and the auxiliary equipment staff must have sufficient capacity and can deal with the problems of this type of equipment and have read and understand the user manual, the equipment management approval can work.
Two operating procedures
1 check before starting:
(1) check the oil level in the oil tank, and assure the oil level to the middle of the oil level window nut in front of the crankcase.
(2) if the machine has been shutdown for a long time, it may be necessary to charge the oil pump.
(3) make sure that the cooling water supply valve is opened so that water circulates through the cylinder liner, intercooler, cooler, and oil cooler.
(4) confirm that the air pressure from the air main pipe is connected to the pressure switch and solenoid valve of the control room.
(5) make sure the main air separation valve is turned on.
2 boot:
(1) turn the main isolating switch to close position, and then the power on light is shining.
(2) switch the off / close selector to close position and assume that the emergency stop button is not locked
Live, the control power closes, the indicator light is on.
(3) press the emergency stop reset button to reset the luminous safety relay, dangerous lights will shine, and sound at
Alarm sounds to indicate that they are available.
(4) press the accept button to stop the alarm and make the relay AV1 power. The AV1 can hold and remove the alarm
Reported power supply.
(5) press the reset button, the fault monitoring relay FR1 to FR4 power, and so the dangerous lamp
The power is lost, but keep their respective relays. With the FR1 to FR2 power, the relay SR2 (malfunction)
Well) there is electricity now.
(6) to confirm the jump instructions have been extinguish
您可能关注的文档
- 2011年8月水泥培训知识(Knowledge of cement training in August 2011).doc
- 2011年6月广东省普通高中学业水平考试地理试卷(June 2011 Guangdong ordinary high school proficiency test geography test paper).doc
- 2011年中考物理68套题汇编及答案(Compilation and answers of 68 sets of physics tests in 2011).doc
- 2011年2月22日止全球4级以上地震汇总(In February 22, 2011, more than 4 earthquakes were collected).doc
- 2011年全国高考化学试题及答案-上海(2011 national college entrance examination chemistry questions and answers - Shanghai).doc
- 2011年全国高考地理试题及答案-上海(2011 national college entrance examination questions and answers - Shanghai).doc
- 2011年ugnx-cad认证考试理论概念题(2011 ugnx-cad certification examination theoretical concept).doc
- 2011年度综治宣传(The 2011 year comprehensive propaganda).doc
- 2011年改善民生,办几件实事(To improve people's livelihood in 2011, do a few practical things).doc
- 2011年全国高考地理试题及答案-江苏(2011 national college entrance examination questions and answers - Jiangsu).doc
文档评论(0)