- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
erp知识点(ERP knowledge)
erp知识点(ERP knowledge)
The development of 1. ERP: the order point method this method is simple and extensive, suitable for single product, simple structure, material demand is relatively continuous and stable business, and is not suitable for a wide range of products, complex structure, material demand varies with the number of products and delivery of enterprise.
The material requirement planning stage: the characteristics of the time period to determine the material demand and demand time, solve the production need what, what, what are the existing, what is missing, when the problems need to be.
Closed loop material requirement planning phase: solving the problem of plan and control.
The manufacturing resource planning stage (MRPII): Based on maintaining the original closed-loop MRP on the increase of financial information and procurement, production, sales integration, increased to reflect the enterprise management goal of the long-term development of the business planning; reflection of product outline of production planning, logistics and capital flow organically, establish the system simulation and other functions.
Enterprise resource planning (ERP): 1. integrated functions beyond the MRPII range. 2. support a hybrid manufacturing environment. 3. support dynamic monitoring capability. 4. support open client / server computing environment.
2. order point calculation: order quantity (OP) = daily average material consumption * purchasing lead time + safety inventory
3. concepts of independent demand and related needs:
Answer: independent requirements of the material refers to the amount of material demand and demand time, and other materials demand and demand time is not directly related. Materials related to demand refer to the quantity and demand time of these materials, which is directly related to the demand and demand time of other materials.
4. enterprise value chain
A: the value chain is the whole organized series of activities from the raw material process
您可能关注的文档
- 3工艺流程图的绘制(3 drawing of process flow chart).doc
- 3章内压薄壁容器的应力化工机械与设备(The 3 chapter is about the stress, chemical machinery and equipment of the inner pressure thin-wall vessel).doc
- 3种发光字楼体发光字,led发光字,灯箱发光字(3 kinds of luminous characters building body luminous characters, LED luminous words, light boxes, luminous words).doc
- 4 工程勘察测量(4 Engineering Survey and survey).doc
- 4-6list gre红宝 txt(4 - 6list gre红宝 txt).doc
- 40cr(40铬钢).doc
- 485通信(485 communications).doc
- 42式太极拳攻防用法图解(一)(Diagram of offensive and defensive use of 42 Style Taijiquan).doc
- 4m1e管理知识(4M1E management knowledge).doc
- 45钢(45 carbon steel).doc
文档评论(0)