_大工13春《建筑设备工程》在线测试1(_ in the spring of 13 building equipment project online testing 1).docVIP

_大工13春《建筑设备工程》在线测试1(_ in the spring of 13 building equipment project online testing 1).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
_大工13春《建筑设备工程》在线测试1(_ in the spring of 13 building equipment project online testing 1)

_大工13春《建筑设备工程》在线测试1(_ in the spring of 13 building equipment project online testing 1) In the spring of 13 building equipment project online testing 1 The multiple choice questions A RadioButtonList (a total of 10 questions, a total of 30 points.) 1. (above) at the height of high-rise building fire, completely rely on interior fire extinguishing system. A. 30m B. 40m C. 50m D. 60m Developing options: C 2. introduction of pipe laying in below the frost line (usually). A. 0.1M B. 0.2m C. 0.5m D. 0.8m Developing options: B The basic indoor water supply 3. of high-rise building, widely used at present (). A. parallel water supply mode B. series water supply mode Water supply C. decompression tank D. water supply valve Developing options: A 4. China city water supply network are used (water). A. high pressure B. in high pressure C. MV D. low voltage Developing options: D (5.) the water quality of no special requirements, but must ensure adequate water and water pressure. A. drinking water system B. production water supply system C. fire water supply system More than three of D. Developing options: C 6. public buildings, water gun full water column length not less than (). A. 5m B. 7M C. 13m D. 15m Developing options: B The 7. is to the drainage engineering design () as the theoretical basis. Theoretical mechanics A. Mechanics of materials B. Structural mechanics C. D. fluid mechanics Developing options: D (8.) common said multi-stage single suction centrifugal pump. A. BA B. SH C. SA D. DA Developing options: D (9.) is characterized by network in the alarm valve before and after the pipeline usually filled with pressure water, the nozzle is normally closed. When the occurrence of fire in the building when the fire point temperature to open close type sprinkler, fire extinguishing water sprayed from the nozzle. A. wet automatic sprinkler system B. pre action sprinkler system C. sprinkler system D. water curtain system Developing options: A 10. laminar water head loss alon

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档