- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
主要人员设备进场计划及保证措施(The main equipment mobilization plan and guarantee measures)
主要人员设备进场计划及保证措施(The main equipment mobilization plan and guarantee measures)
The new key personnel, equipment mobilization plan and security measures, a project of Yun Gui railway hub of the Nanning Railway Station east from Nanning along both the Nanning Kunming railway corridor after the introduction of both the BaiSe Railway Station. After the line west across Youjiang into the territory of Yunnan province after Wenshan, Funing County, Guangnan county and Maitreya River Street in Qiubei County near the cross Nanpanjiang Honghe Maitreya County into the Kunming Shilin County in the south side of Yiliang again after the Vietnam cross Panjiang Yangzong town in the East after the Kunming New District of Chenggong City, KunMing South Railway Station line into Kunming. Hub. The new cloud GUI railway line length of 709.518 km of which 431.183 km Yunnan province. The tenders for the project six standard DK598340DK651230 station is 52.4 kilometers length of main engineering tunnel 9 31978 meters 16 bridges including large bridge 7 bridge 5 6531.979 meters 1405.121 meters in 1 seat 109.938 meters bridge 3 meters a total of 8108.218 meters 61.18 extended culvert 35 a total of 1674.94 horizontal meter track engineering the ballastless track is 33.28 km long track is 19.12 km long and other information communication and signal operation of production equipment and building large temporary facilities and transition project etc.. Two, personnel and equipment access to the situation as of September 10th, I Department of the total entry staff 974, the main management of 287 people, of whom 40 project managers, project division 247, 667 construction personnel. Machinery and equipment to 233 sets of excavators, 24 loaders, 4 bulldozers, rollers 2, mixer 11, crane 3, concrete transport vehicles 7, wet spray machine 11, 29. Three, the main program of project manager department personnel arrived at the scene at present the main management personnel have all arrived at the scene of each
您可能关注的文档
- 一线城市 or 二线城市(目前为止,看过的最理性最系统的分析)(First-tier cities or second tier city (see the most rational analysis system so far)).doc
- 一般工业固体废物贮存、处置场污染控制标准(Landfill pollution control standard for storage, general industrial solid waste).doc
- 一至五年级共识和概念(One to the fifth grade and the concept of consensus).doc
- 一般水处理方法及原理(The general principle and method of water treatment).doc
- 丁基胶、硅酮胶、硅酮结构胶的区别(The difference between butyl rubber, silicone rubber, silicone rubber structure.).doc
- 一般路基设计(Roadbed design).doc
- 一齿轮轴(A gear shaft).doc
- 七下地理期中复习提纲(The seven mid-term review outline of Geography).doc
- 七年级下册地理期中复习提纲(人教版(Grade seven geography mid-term review outline (PEP).doc
- 七年级上册历史期末复习提纲(Seven grade history review outline).doc
- 主要测井曲线及其含义(The main logging curve and its meaning).doc
- 主谓宾例句(SVO.).doc
- 主题活动我们的城市(Theme our city).doc
- 主键与索引(一)(The primary key and index (a)).doc
- 主题装修至今一些很好的经验,写在装修日记没人看就贴这,32楼巴黎(Theme the decoration has some good experience, write no one in the decoration diary posted in this building, 32 Paris).doc
- 丽江08年地质灾害防治方案(Lijiang 08 years of geological disaster prevention project).doc
- 之漫画(The cartoon).doc
- 乌鲁木齐地源热泵应用经济技术分析(The analysis of Urumqi economic and technological application of GSHP).doc
- 乌龟养殖法及其他(The turtle breeding method and other).doc
- 乐嘉语录(Le Jia Quotes).doc
文档评论(0)