- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
井点降水施工组织设计(The organization construction dewatering design)
井点降水施工组织设计(The organization construction dewatering design)
I. Engineering Overview
According to the actual excavation of underground water level of shallow, -0.9m meters deep buried foundation see groundwater, natural ground based 4.0m elevation, and soon entered the rainy season, the rising of groundwater level, soil water content is close to saturation, the construction condition brings great difficulties to the foundation construction. After foundation excavation at the risk of landslides, many of them from the original buildings, pipe rack, sewage pipes and sewage well, especially in the past, if the collapse of foundation excavation, foundation and disturb the existing pipelines, will do great harm to the original building, may cause major accidents, consequences be unbearable to contemplate, the existence of security great hidden trouble.
Therefore, according to the actual situation, using the dewatering of the well point, the excavated soil is dry and can be directly used for backfilling. On the contrary, the water content in the soil is saturated and can not be used directly for backfill. In order to meet the requirements of civilized construction, to ensure the safety and quality of the project, to take measures of light well point precipitation of our company, from wells water must be discharged into the drainage well according to the requirements specified, and do a good job of filtering drainage, the dewatering and drainage work should continue to backfill foundation engineering can be stopped after completion and to ensure the foundation construction in dry conditions.
Two. Compilation basis
1. Acceptance specification for construction quality of foundation and foundation engineering GB50202-2002
2 Building Construction Manual (Fourth Edition)
2 construction drawings S4060.00-JG03
3, site actual investigation
Three 、 construction preparation
According to the structure, characteristics, schedule requirements and actual situation of the project, invest e
您可能关注的文档
- 专用条款(Special terms).doc
- 专科专业分类(Specialty classification).doc
- 专科考研(College entrance examination).doc
- 专题五 地壳运动规律和地理分异规律(Five topics of crustal movement and geographic variation).doc
- 世界3所有合成(The world's 3 all synthesis).doc
- 世界主要航线、海峡、运河的综合比较(A comprehensive comparison of the world's main route, channel, canal).doc
- 世界历史年表截至1993年(The chronology of world history as of 1993).doc
- 世界名花唐昌蒲-箭兰(World famous flowers Tang Changpu - Blue Arrow).doc
- 专业工程管理与实务——市政公用工程专业》(Professional project management and practice of municipal public engineering ).doc
- 世界地理专题复习之《世界陆地与海洋》(The world of land and sea world geography review ).doc
文档评论(0)