人工挖孔桩(Artificial digging pile).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
人工挖孔桩(Artificial digging pile)

人工挖孔桩(Artificial digging pile) Standard Specification for Manually Excavated Pile I. acceptance data of foundation piles and pile caps 1. when the design elevation of pile top elevation and the construction site is close, acceptance of pile foundation engineering pile should be completed after acceptance, when the design elevation of pile top elevation is lower than the construction site, to be excavated to the design elevation for acceptance. 2. the pile foundation acceptance shall include the following information: 1) notification report, pile foundation construction drawings, drawings, summary of the design change and substitute materials in engineering geological exploration. 2) the approved construction organization design, construction plan and changes in the implementation. 3) pile location survey drawing, including the pile position line review, the visa form. 4) quality inspection report of pile forming. (small strain) 5) test report of bearing capacity of single pile. (static loading test, core pulling, etc.) 6) the foundation pit excavation to the design elevation of the completion of the pile foundation plan and pile top elevation map. 3. the acceptance of the pile cap project shall include the following information: 1) construction and inspection record of steel bar and concrete; 2) the distance between the pile head and the anchor bar of the pile cap, the distance of the side pile from the edge of the cap, and the reinforcement protection layer of the cap; 3) cap thickness, length and width records and appearance description, etc.. Two. Quality inspection of pile forming Check the quality of 1. pile pile quality inspection mainly includes Jiqing hole hole, fabrication and installation of reinforcement cage, concrete mixing and pouring process three. 1) concrete mixing shall be carried out for the quality and measurement of raw materials, concrete mix ratio, slump and concrete strength grade; 2) steel cage production shall be checked for the specificati

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档