- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
东财《工程造价管理》在线作业二(Easternmoney project cost management online homework two)
东财《工程造价管理》在线作业二(Easternmoney project cost management online homework two)
Easternmoney project cost management online homework two
Multiple topics
First, radio questions (15 questions, 60 points)
1. in the process of calculating the cost, the unit price may include the direct cost, the unit price, or the.
A. indirect charge unit price
B. direct and indirect cost price
C. cost plus premium unit price
D. comprehensive unit price
Developing options: D
2. the composition of the indirect fee includes:
A. enterprise management fee and measure fee
B. fees and measures
C. enterprise management fees and fees
D. temporary facilities and site management fees
Developing options: C
3. a sub project of the contracted project amount to 1500 cubic meters, the actual completion of the project amounted to 1800 cubic meters, the provisions of the contract the contract price of 20 yuan per cubic meter, engineering quantity exceeds 10%, the price is down 10%, the settlement of the purchase price should be:
A. 30 thousand yuan
B. 36 thousand yuan
C. 35 thousand and 700 yuan
D. 32 thousand and 400 yuan
Developing options: C
4. the term of the warranty shall be determined in accordance with the principle of ensuring the normal use of the building in a reasonable life and safeguarding the legitimate rights and interests of the user. In accordance with the relevant provisions, roofing waterproof works, waterproof requirements of bathrooms, rooms and walls of the seepage prevention, warranty period () year.
A. 1
B. 2
C. 3
D. 5
Developing options: D
5., in accordance with the bill of quantities valuation standards, construction enterprises reported sub sub unit price should not include:
A. talent cost
B. management fees
C. profit
D. tax
Developing options: D
6. the project cost consulting unit shall, within 30 days from the date of occurrence of the case, report to the competent management department for the filing procedures:
A. separate or merge
B. closed for more than six months
C. change t
您可能关注的文档
- z11-12齿轮强度计算(The gear strength calculation of z11-12).doc
- yz液下渣浆泵(YZ slurry).doc
- xx镇2005上半年基层组织建设工作自查总结(The town of XX in the first half of 2005 basic level organization construction work of self-examination and summary).doc
- zbrush中英文对照表(ZBrush English table).doc
- zfb05与ga06(Zfb05 and ga06).doc
- zhongkeyuan2012考研化工原理大纲(Zhongkeyuan2012 Graduate School of chemical engineering principle.).doc
- zhongyaode包扎法(zhongyaode包扎法).doc
- zd自平衡高效节能多级泵(ZD multistage self balanced energy efficient pump).doc
- [儿内] 学会处理儿科急症([children] to learn to deal with pediatric emergencies).doc
- [全国]中国中铁隧道集团2012招聘([National] Chinese China Railway Tunnel Group recruitment 2012).doc
- 两会评估垃圾焚烧的好处(NPC and CPPCC assessment of waste incineration benefits).doc
- 两会(Two sessions(NPC and CPPCC)).doc
- 两次涟水保卫战(The two battle of Lianshui).doc
- 东川概况(Overview of Dongchuan).doc
- 两情若是长久时有岂在朝朝暮暮(A long time if the two conditions are not in every morning and evening).doc
- 两台电脑怎样连(Two computer connection).doc
- 东莞社会经济转型对东莞民营企业的影响(Influence of Dongguan social and economic transformation of Dongguan private enterprises).doc
- 两种根基(Two foundation).doc
- 个人买卖住房相关税收政策(The sale of personal housing related tax policy).doc
- 个人取得房租收入如何计算纳税(How to calculate the tax income individuals to obtain the rent).doc
文档评论(0)