- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
人工挖孔桩施工工艺标准(Artificial dig hole pile construction technology standards)
人工挖孔桩施工工艺标准(Artificial dig hole pile construction technology standards)
Construction standard of manual digging pile
Construction standard of manual digging pile
1. dig holes
(1) the first ring wall than the thick wall hole under 100-150mm, and should be higher than the ground 200-250mm, lap length on the wall not less than 50mm.
(2) to ensure the integrity of the wall concrete wall, depending on soil conditions, must use the uniform layout for reinforced with 8 tie bar, in order to avoid disconnection sinking, such as wall design drawing, according to the design requirements of the construction.
(3) when placing concrete for protecting wall, use punch template and insert with bamboo and wooden sticks, and do not pour concrete under the condition that the pile hole is flooded with no formwork. According to the soil conditions, try to use the accelerator, as soon as possible to meet the design strength requirements. It is found that the retaining wall has honeycomb and water leakage, and it should be blocked and guided in time to prevent the water from passing through the wall into the hole, thus ensuring the strength and safety of the wall concrete.
(4) the removal of the internal formwork of the retaining wall, according to the temperature, etc., can be carried out after 24 hours, so that the concrete has a certain strength, so that it can block the earth.
(5) when the first section of concrete wall after stripping, which is the axis position calibration in wall, and the relative level draw down on the first lap in the wall with level, as control of pile hole position and the verticality and determined on the basis of the depth of the pile and pile top elevation.
(6) the geological situation of the construction personnel must be familiar with the digging, and frequently check, pay attention to the change of soil, sand, etc. when a large number of groundwater impact excavation safety, should immediately take effective measures of protection, in order to continue con
您可能关注的文档
- 中华人民共和国煤炭法(2009年修正)(People's Republic of China Coal Law (amended in 2009)).doc
- 中华人民共和国集体土地使用权流转法(The transfer method of collective land use right in People's Republic of China).doc
- 中华成语归类大全(The classification of the idioms.).doc
- 中华蚊母扦插繁殖栽培技术(Cultivation techniques of Cuttage Propagation of Distylium chinense).doc
- 中华钙果(The fruit).doc
- 中南林学院05年考研材料力学考试大纲(Zhongnan Forestry University 05 years postgraduate exam outline of mechanics of materials).doc
- 中国-东盟博览会对广西经济社会发展影响深远(China ASEAN Expo on Guangxi's economic and social development has far-reaching influence).doc
- 中国b2c十年点评(Chinese B2C ten years review).doc
- 中国——地质队伍现状(Present situation of Geological Team -- China).doc
- 中国c(Chinese C).doc
- 2025年中国豆掰酱数据监测报告.docx
- 2025年中国纬编针织布数据监测报告.docx
- 2025年中国固体塑料瓶数据监测报告.docx
- 2025山东济宁市泗水县事业单位招聘(卫生类)38人考前自测高频考点模拟试题及答案详解(最新).docx
- 水污染控制工程讲课课件.pptx
- 20253月值班和交接班制度考试题.docx
- 2025山东济宁市泗水县事业单位招聘(卫生类)38人考前自测高频考点模拟试题及答案详解(夺冠).docx
- 2025山东济宁市泗水县事业单位招聘(卫生类)38人考前自测高频考点模拟试题及答案详解(名师系列).docx
- 体育教育全面革新.pptx
- 2025年中国合成纤维辊数据监测报告.docx
文档评论(0)