建筑给排水毕业设计实习日志(Building water supply and drainage design practice log).docVIP

  • 23
  • 0
  • 约 20页
  • 2017-08-18 发布于河南
  • 举报

建筑给排水毕业设计实习日志(Building water supply and drainage design practice log).doc

建筑给排水毕业设计实习日志(Building water supply and drainage design practice log)

建筑给排水毕业设计实习日志(Building water supply and drainage design practice log) Building water supply and drainage graduate design practice log Its fine on Wednesday, June 19th Last night after the dormitory to study drawings, has been seeing more than 11 minutes, after going to bed, full of brains, drawings, fighting. This is a technological expansion project, the main content for the construction of a factory owned thermal power station and alkali recovery project, the size of unit project 36, the main building will be used in the boiler room, power distribution room, steam turbine room together, and with the coal corridor, chimney connection, complex structure, high degree of difficulty, is the key part of the whole project project. In the construction project, also has a very simple structure of the cottage, such as brick masonry structure instrument maintenance workshop and steel structure of dry coal shed. There are also a number of underground reinforced concrete tanks and two 45m (high chimneys), one is reinforced concrete, the other is a brick chimney *. Zhao engineer said, the project should strive to win the bid. I want to participate in the construction after winning the bid, and it is an excellent opportunity for me to study and exercise. I think, I was wearing a helmet, wearing overalls, standing on high scaffolding, inspect the quality of the construction practice, I feel toward the distant view, a sudden gust of wind, shaking the scaffold after a few threw me in the air, I yelled out to wake up originally, is a dream, just think back full of sweat. Its cloudy on Friday, June 21st Morning and Zhao engineer went to the paper mill site for field visits. Zhao said, in the preparation of construction organization design (scheme), to carry out on-site inspection, do not, most probably it did not actually happen behind closed doors. Only after a detailed understanding of the specific circumstances of the site, the preparation of the construction organization design (

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档