长螺旋钻孔桩机施工及拆缷安全技术要点(Long spiral bored pile construction and demolition machine technical points off safety).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
长螺旋钻孔桩机施工及拆缷安全技术要点(Long spiral bored pile construction and demolition machine technical points off safety)
长螺旋钻孔桩机施工及拆缷安全技术要点(Long spiral bored pile construction and demolition machine technical points off safety)
Long spiral bored pile construction and demolition machine technical points off safety
With the development of our economy, science and technology. We have the ability to produce large machinery and equipment to help us carry out construction. This saves a lot of manpower and material resources. Whats more, our work efficiency has been greatly improved. However, with the use of machinery and equipment, the security problems are becoming more and more serious, and some safety problems in construction can not be ignored.
The pile and pile equipment installed in the construction shall be operated strictly according to the relevant working procedures. During the construction period, they should also be checked and observed frequently, and shall be carried out in accordance with the sequence of pile positions determined by the organization design. Before commencement of operation, technical personnel shall give safety management and technical disclosure to all construction personnel (crew operation), and assign professional safety management personnel.
1, screw pile machine operator must go through strict pre job training, qualified only after induction of construction, shall not be prohibited AWOL during construction, irrelevant personnel into the (room) post operation.
2, the operators should be familiar with in Henan Sanli machinery bored pile machine function, technical parameters, operating conditions, the operation should be accurate and smooth, non mechanical sick barbaric operation load, construction.
In 3, before the formal construction, empty load joint commissioning view to deal with assembled long screw pile machine equipment and auxiliary equipment, watch parts (bit) correctly smooth, no abnormal noise control instrument is sensitive to reflect, electrical wiring is working properly. Problems should be adjusted and repaired in a timely manner.
4, the co
您可能关注的文档
最近下载
- 焊接与切割安全GB9448-1999 .pdf VIP
- 电话销售管理培训.pptx VIP
- 【课件】2025高三英语一轮复习备考策略及方法指导.pptx VIP
- .NETCore框架演进-洞察分析.pptx
- (完整版)测绘工程产品困难类别细则(2002).pdf VIP
- 《供热系统有限空间作业安全技术规程》DB11T 1135-2024.pdf VIP
- Unit 1 This is me--Understanding ideas 新版 2025年新外研版八年级上册 课文知识与详解.docx
- 最新检验检测机构全套质量手册及程序文件.pdf VIP
- 冠心病课件(共54张课件).pptx VIP
- 急性胰腺炎护理疑难病例讨论.doc VIP
文档评论(0)