预制桩(Precast pile).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
预制桩(Precast pile)

预制桩(Precast pile) Effective pile length: the loads in the specific (or under certain restrictions under the pile top settlement of pile top load), failed to transfer to the pile end, only to a certain position of the pile length, generally refers to the transmission depth is less than the actual length of the pile length. The industry generally refers to the whole section section. Several other long pile concepts are as follows: The design of pile length: general design for a range of values, because the soil area is not uniform, especially bearing layer depth is not the same, the general design have clear requirements for the pile into the bearing layer depth. Drilling and digging piles depend on the soil sample or rock sample of the soil layer of the bearing stratum. The driving and pressing of the pile should be controlled by the penetration depth, the oil pressure, the penetration depth and the penetration rate. Construction pile length: some should calculate the over irrigation section, and some directly use the hole depth or the buried depth to replace the construction pile length and the entrusting party to settle accounts. The length of the pile under the measuring point: the actual length of the pile below the installation position of the sensor. Usually calculated according to the depth of excavation and the depth of excavation treatment. Kong Shen: from the natural ground to the depth of the bored pile or the bottom of the bored pile, the total height of the concrete is generally lower than the hole depth. Embedded depth: the concept of general precast pile or immersed tube pile construction is also calculated from the natural ground. The effective pile length is different according to the force condition, and it is not easy to calculate What you estimate is the budget and final accounts, is that true?: The budget is calculated according to the length of the design pile, and the settlement is calculated according to the length of the pile to be buried. Th

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档