建筑施工单位准备阶段资料(The construction unit data preparation stage).docVIP

建筑施工单位准备阶段资料(The construction unit data preparation stage).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑施工单位准备阶段资料(The construction unit data preparation stage)

建筑施工单位准备阶段资料(The construction unit data preparation stage) This paper is composed of 5 yuan contribution etc. Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. The construction unit data preparation stage Preliminary data A first approach to: 1, project report, construction permits, construction organization design, materials, equipment aproval. 2, concrete mix design, material test. 3, construction site acceptance. Temporary facilities (scheme), safe and civilized construction preparation. 4, engineering measurement positioning records should be all ready: construction materials construction approval table basic situation (to the construction unit of the vertical approval) construction project planning permit (to the construction unit of the construction project planning permit) the notice (to the construction unit to the construction contract (the notice) the construction contract to the construction unit of the supervision contract (contract) to the supervision of supervision units, construction units and personnel qualification) copy of the certificate of project supervision institution and related certificate copy design qualification, personnel copy of the certificate of survey unit qualification, personnel certificate copy of project construction and related institutions (including a copy of the certificate of qualification certificate, certificate of personnel (construction, budget, inspectors, security staff, materials, labor workers, surveyors, samplers , documenters, drainage, heating, electrical engineer, project manager) drawings and records of design change document design documents and design changes before the start of the construction site quality management inspection record and Schedule 1, responsibility for the quality of a table, 2 main types of professional operation certificate (crane, scaffolder, Longmen frame, electric welder, welder straight rib, electro

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档