网站大量收购独家精品文档,联系QQ:2885784924

钢筋混凝土预制桩打桩工艺标准(Standard for piling process of reinforced concrete precast piles).doc

钢筋混凝土预制桩打桩工艺标准(Standard for piling process of reinforced concrete precast piles).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钢筋混凝土预制桩打桩工艺标准(Standard for piling process of reinforced concrete precast piles)

钢筋混凝土预制桩打桩工艺标准(Standard for piling process of reinforced concrete precast piles) Standard for piling process of reinforced concrete precast pile (203-1996) Range This standard is applicable to the construction of precast reinforced concrete piles in industrial and civil buildings Construction preparation 2.1 materials and main equipment: 2.1.1 precast reinforced concrete pile: specifications and quality must comply with the design requirements and construction specifications, and have the factory certificate. 2.1.2 electrode (with pile): model, performance must comply with the design requirements and the relevant standards, the general use of E4303 brand. 2.1.3 steel (pile used): material, specifications meet the design requirements, should use low carbon steel. 2.1.4 main machines are: diesel pile driver, welding machine, pile cap, and pile driving trolley. Wire rope, wire rope, steel plate or steel and wooden folding ruler and so on. 2.2 operating conditions: 2.2.1 pile axis and elevation have been measured and organized through the pre inspection procedures. The pile shaft and the elevation of the control pile should be set up where the pile is not affected and should be properly protected. 2.2.2 deals with obstacles in the upper air and underground. In the case of the use or safety of adjacent buildings or structures, effective measures shall be taken to deal with the units concerned. According to 2.2.3 released pile axis line, with a wooden peg or a steel screw pile, and lime as an indicator for the injections. 2.2.4 site should be rolled and leveled, and the drainage is smooth, so as to ensure the movement and stability of the pile machine. 2.2.5 test pile. Piles must be tested before construction, with less than 2 pieces of wood. Determine penetration, and verify piling equipment, construction technology and technical measures are appropriate. 2.2.6 shall select and determine the entry and exit routes and piling sequences of the piling machine, formulate cons

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档