铝塑板施工工艺及流程(Construction process and process of aluminium plastic plate).docVIP

铝塑板施工工艺及流程(Construction process and process of aluminium plastic plate).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
铝塑板施工工艺及流程(Construction process and process of aluminium plastic plate)

铝塑板施工工艺及流程(Construction process and process of aluminium plastic plate) Construction process and process of aluminium plastic plate 1. Measure the line 1) according to the axis and the elevation line of the main structure, the installation position line of the support skeleton is accurately bounced onto the main structure according to the design requirements. 2) will play and retest all anchors, its size. 3) the distribution error should be controlled when measuring the line, not the error accumulation. 4) measurements shall be carried out at a level of no more than four wind. The line should be checked in time to ensure the verticality of the curtain wall and the correct position of the upright post. 2. Install connectors The connector with the main structure of the embedded parts are welded and fixed. When the embedded iron piece is not embedded in the main structure, the expansion bolt can be fixed on the main structure and fixed with the connecting iron piece. 3. Install the framework 1) the post of rust prevention is fixed on the connecting piece by welding or bolt accurately and accurately according to the position of the bullet line. The installation should always check the elevation and position of the center line of the larger, higher storey wall aluminum curtain wall studs, must use the measuring instrument and measuring line fall, correct its position, in order to ensure the smooth and vertical frame vertical rod. Post installation elevation deviation should not exceed 3 mm, the axis deviation and should not exceed 2 mm, lateral deviation should not exceed 3 mm; two adjacent columns elevation deviation should not exceed 3 mm, the maximum elevation deviation with the layer column should not exceed 5 mm, two adjacent upright distance deviation should not exceed 2 mm. 2) the connecting piece and the washer is arranged on the predetermined position of the beam ends, and should be firmly installed, the joints should be tight; horizontal deviation of two adjace

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档