工程量测算新方法的探讨与应用(一)(Study and application of the new method to calculate the quantity of (a)).docVIP

工程量测算新方法的探讨与应用(一)(Study and application of the new method to calculate the quantity of (a)).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程量测算新方法的探讨与应用(一)(Study and application of the new method to calculate the quantity of (a))

工程量测算新方法的探讨与应用(一)(Study and application of the new method to calculate the quantity of (a)) Xian Heihe Jinpen water conservancy project is the priority among priorities of our province in the construction of key projects, Xian City Peoples lifeline engineering, Hydropower Engineering Bureau in Shaanxi Province as the main body of the construction (Group) limited liability company used with the worlds advanced level of construction machinery, construction technology and advanced instrument of surveying and mapping in construction in the construction survey and engineering survey technology with a new look in Heihe site. According to the advanced measuring instruments equipped with high precision, such as total station (Leica TC1700, TCR305, GTS711, T2 top Kang) theodolite with Leica Dir3002 remote prism rangefinder, some outstanding characteristics of high intelligent mapping software composed of electronic plate, summarizes some specific, simple, practical and efficient a new method to calculate the engineering quantity, and achieved good results in engineering construction. 1 section method We envision the use of plane control points in the construction area, the use of total station or theodolite with the range finder remote measurement section, as a good plane control point, a station to complete a project all section measurement task. 1.1 principle Total station or theodolite with the range finder can directly or indirectly obtain the three-dimensional coordinates of stations, using this function, as long as the station and baseline into a unified coordinate system through coordinate rotation, the establishment of new construction in the coordinate system, measuring instruments and measuring site erection input sites for baseline and mileage normalized distance (wheelbase), at this time, the vertical and horizontal transverse point coordinates of measured point is the point of the pile and the pile number on the. (1) establish an independent construction coordin

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档