官地碾压混凝土大坝仓面设计与施工(Design and construction of RCC dam face, warehouse).docVIP

官地碾压混凝土大坝仓面设计与施工(Design and construction of RCC dam face, warehouse).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
官地碾压混凝土大坝仓面设计与施工(Design and construction of RCC dam face, warehouse)

官地碾压混凝土大坝仓面设计与施工(Design and construction of RCC dam face, warehouse) Design and construction of dam surface of Guandi roller compacted concrete dam Ge Jianzhong, Zhao Xiyun, Wang Cizhong 1 General Provisions Guandi hydropower station is located at the junction of Sichuan Yi Autonomous Prefecture in Liangshan province Xichang and Yanyuan County on the Yalong River, is a type of RCC gravity dam. The normal water level is 1330.0m, the crest elevation of 1334m, the maximum dam height is 168m, the maximum width 152.8m. The 5 table +2 bottom hole dam combined discharge scheme. The width of each dam section is as follows: Left Dam Section 1, width 25m, Section 2 to 10; width 20m; overflow dam section 11 to 15; dam width 20m; right dam retaining section 16 to 22; dam width 20m; 23 and 24 dam width 7m. In order to realize the construction of roller compacted concrete fast, high mechanical continuous of the characteristics, to prevent any one part of the whole production system failure, not coordinated or not complete, and then affect the project schedule, quality and characteristics of roller compacted concrete play, before construction preparation construction method of roller compacted concrete, the quality management measures of Guandi Hydropower Station in particular, preparation of deck design in detail, and in the implementation process will be the construction process of RCC and the process of decomposition, the responsibility to the people. This paper briefly introduces the construction of large surface of Guandi roller compacted concrete dam. 2 bin design The government is mainly responsible for the Construction Bureau No. 14 No. -24 dam construction, RCC construction of the largest storehouse surface area near 11000M2, is the smallest area has reached 6000m2, according to the design requirements of roller compacted layer thickness 30cm, a layer of compacted concrete amounted to 3300m3. Due to the limitation of construction equipment and site, the construction speed

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档