土方回填(Earthwork backfilling).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土方回填(Earthwork backfilling)

土方回填(Earthwork backfilling) Earthwork backfill construction scheme Source: Author: Brotherhood of lively and vigorous flourishes in calligraphy date: [2010-8-20] 4, technical disclosure before construction Before backfilling, the technology department to conduct technical tests with QC operations team, the backfill area division, according to the account of compaction parameters and rolling test to determine the construction method and clear. Three, construction deployment This project was carried out according to the construction sequence of box culvert backfill, in order to adapt to and meet the construction subject of the buildings need to backfill conditions, each about 210m as a filling, the filling speed and building construction speed, continuous backfilling. Take two kinds of backfill, scheme, namely the heap of soil side using a large bulldozer to send soil excavation, the other side of the excavator with soil, dump truck from one end to rotate in place, do both sides rise evenly backfill. When the soil backfill to culvert top 1m (i.e. at 1.70), are used in place of large bulldozer. Four 、 construction methods and procedures 1 construction procedures: 2 construction methods 2.1 earthwork backfill area division 2.2 filling method 2.2.11 area: the part of earth filling soil filling is narrow and deep, inverted triangle section, backfill material can not be used directly in place by bulldozers bulldozing, in the two level platform set down soil excavator will be in place, and then artificial paving, frog ramming. 2.2.23: when the width of 1 earthwork backfilling backfilling area more than 5m when entering into the 3 District backfill soil material directly from the right side of large bulldozer in small bulldozer flat rolling; left by the free soil material unloading vehicle to rotate in place, a small bulldozer spreading and rolling, the right set of 4 D60 large bulldozer 2 sets of 74KW bulldozer, paving soil and rolling, left 5 dump truck transport, 1 sets o

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档