宁波甬商置业有限公司世界中华总商会总部办公楼项目(Ningbo Yong Shang Real Estate Co., Ltd. world China Chamber of Commerce headquarters office building project).docVIP
- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
宁波甬商置业有限公司世界中华总商会总部办公楼项目(Ningbo Yong Shang Real Estate Co., Ltd. world China Chamber of Commerce headquarters office building project)
宁波甬商置业有限公司世界中华总商会总部办公楼项目(Ningbo Yong Shang Real Estate Co., Ltd. world China Chamber of Commerce headquarters office building project)
Ningbo Yong Shang Real Estate Co., Ltd. world China Chamber of Commerce headquarters office building project
Environmental impact assessment approval publicity
Ningbo Real Estate Co. Ltd. Ningbo World Chinese Chamber of Commerce headquarters office building project environmental impact report has been completed by the environmental protection science research Design Institute of Zhejiang province compiled, according to the relevant provisions of the public participation in environmental impact assessment and Interim Measures, the announcement of the EIA report, disclose relevant information to the public, and to solicit public opinion.
I. outline of construction projects
Name of the project: office building of the headquarters of the world trade association of China
Construction scale: Ningbo Yong Shang Real Estate Co., Ltd. intends to build a new building of the headquarters of the world trade association of China in the A3-20 block of the eastern New Town Central Business district. The project covers an area of 13800 square meters, with a total floor area of about 91080 square meters, underground (2 floors), about 21000 square meters. Among them, the office building (26 floors) about 47300 square meters, The Residence Hotel (26 floor) about 30000 square meters, the public and the bottom business (2 floors) about 8780 square meters, club (3 layers) about 5000 square meters.
Two, the impact of construction projects on the environment outlined
The environmental impact of the project mainly for the construction dust, waste water, garbage and construction noise; the operation of automobile exhaust gas, sewage, garbage and vehicle noise impact on the environment and project construction, covers an area of social and ecological pollution.
Three, prevention or mitigation of adverse environmental impact of countermeasures and measures
Seri
您可能关注的文档
- 大学生必知的毕业五险一金说明(Students must know that graduated from five social insurance and one housing fund).doc
- 大学生感谢信精华篇(College student letter of thanks).doc
- 大学生面试求职技巧智力应聘,挑战世俗 我与各银行间的面试之战(Student interviews, job hunting skills, intelligence applicants, challenges, the war between me and the banks).doc
- 大学老师抓学生作弊,却被迫下岗!(University Teachers arrested students for cheating, but were forced to be laid off!).doc
- 大学英语四级词汇 s(CET four, vocabulary s).doc
- 大学英语精读第四册第一单元翻译(College English intensive reading, volume fourth, unit 1 Translation).doc
- 大学计算机基础上机考试模拟题(University computer basic examination simulation questions).doc
- 大学里面常见的几种室友(Common roommates in College).doc
- 大学预备役(University reserve).doc
- 大学语文(College Chinese).doc
文档评论(0)