广日梯gvk.gvb.gvh.gvz.变频调速电梯调试(Wide day ladder gvk.gvb.gvh.gvz. frequency control elevator debugging).docVIP
- 44
- 0
- 约9.9千字
- 约 11页
- 2017-08-20 发布于河南
- 举报
广日梯gvk.gvb.gvh.gvz.变频调速电梯调试(Wide day ladder gvk.gvb.gvh.gvz. frequency control elevator debugging)
广日梯gvk.gvb.gvh.gvz.变频调速电梯调试(Wide day ladder gvk.gvb.gvh.gvz. frequency control elevator debugging)
Wide day ladder GVK.GVB.GVH.GVZ. frequency control elevator debugging
First of all, on-site electrical wiring inspection.
I. overhaul status trial run
A car overhaul:
1 check and check whether the setting parameters of frequency converter meet the requirements.
2 in the car, the switch will be placed in the overhaul state. Then do not leave the car in the car, and on the computer control panel operation.
3 at this point, PC machine input point X7 bright, X10 out of the car can be checked by way of trial operation.
4 within the car overhaul uplink, can be 11L14 high station internal command input point short connection.
5 within the car overhaul downlink, available 11L40 with the lowest level station within the instruction input point short
B car top overhaul: X7.X10 is not available at this time, you can use car top overhaul trial run.
1. car top overhaul uplink, 11L40 and 21L6 short, [X11 bright]
2. The top of the car is under repair and 11L40 and 21L7 are shorted. [X12 bright].
3, maintenance operation lift state; when 11L40 and slow or slow down point, the elevator should be closed immediately, [PC, out of Y3. GMJ uplink; SJ uplink or XJ uplink]. At the end
After full shutdown, the [Y3 is extinguished; the GMJ is down. Y14 or Y15 `Y12`Y0 light]. The elevator starts immediately, up or down. At this point, observe whether the direction of the elevator is in accordance with the direction of your instruction; if not, change the setting value LF5 of the frequency converter [0/1] until the direction of the elevator is in accordance with the direction of your instruction. At the same time, the direction and to observe the parameters of converter [+ - LF88 and LF89 are the same. If not, it is necessary to change the setting value [on/off] of the frequency converter LF18. Until the two directions are identical.
4. the maintenance status should be opened immediately after the
您可能关注的文档
- 家装巧妙选择给水管道(Home improvement clever choice of water pipes).doc
- 家装必须要知道的程序! 档(Home improvement must know the procedures!).doc
- 家纺专卖店经营策略和销售(Home textile store business strategy and sales).doc
- 家装中最常见的19种后悔药-(Home improvement in the most common 19 kinds of regret -).doc
- 家装小介绍(Home improvement small introduction).doc
- 家装注意事项100条(Home improvement notes 100).doc
- 家装设计师(Autodesk Homestyler).doc
- 家装设计理念01(Home improvement design concept 01).doc
- 家装隐形门的施工工艺(Construction technology of concealed door for home improvement).doc
- 家装cad心得(Home improvement CAD experience).doc
- 中国国家标准 GB/T 6675.9-2025玩具安全 第9部分:化学及类似活动的实验玩具.pdf
- 《GB/T 6675.9-2025玩具安全 第9部分:化学及类似活动的实验玩具》.pdf
- GB/T 46975-2025婴童用品 便携式婴儿睡篮技术要求.pdf
- 中国国家标准 GB/T 46975-2025婴童用品 便携式婴儿睡篮技术要求.pdf
- 《GB/T 46975-2025婴童用品 便携式婴儿睡篮技术要求》.pdf
- 《GB/T 6675.14-2025玩具安全 第14部分:指画颜料要求和测试方法》.pdf
- GB/T 6675.14-2025玩具安全 第14部分:指画颜料要求和测试方法.pdf
- 中国国家标准 GB/T 6675.14-2025玩具安全 第14部分:指画颜料要求和测试方法.pdf
- 中国国家标准 GB/T 33772.3-2025质量评定体系 第3部分:印制板及层压板最终产品检验及过程监督用抽样方案的选择和使用.pdf
- 《GB/T 33772.3-2025质量评定体系 第3部分:印制板及层压板最终产品检验及过程监督用抽样方案的选择和使用》.pdf
最近下载
- GB/T 17359-2023微束分析 原子序数不小于11的元素能谱法定量分析.pdf
- 工业和信息化领域数据安全风险评估实施细则.pptx VIP
- 江西省“三新”协同教研共同体2025届高三12月联考生物学试卷(含答案).docx VIP
- 配电线路器材 -横担、绝缘子.ppt
- 00J008-3钢筋砼挡土墙.pdf
- 2024年华北科技学院马克思主义基本原理概论期末考试题含答案.docx VIP
- 《配电线路工程》 课件 3-9接地装置安装.pptx
- 2025-2026学年丹阳市八年级上学期数学期末模拟试卷.docx VIP
- 配电线路防雷技术.pptx VIP
- 高二数学(文)双曲线知识精讲 人教实验版(A).doc VIP
原创力文档

文档评论(0)