建筑工程设计范文2(Architectural engineering design model 2).docVIP

建筑工程设计范文2(Architectural engineering design model 2).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程设计范文2(Architectural engineering design model 2)

建筑工程设计范文2(Architectural engineering design model 2) Key words: owner representative project management Abstract: project construction is a major investment in fixed assets, which involves great cost, long payback period and wide range of investment. Based on the engineering practice, this paper sums up the problems that should be paid attention to by the owners representatives in the project management, and puts forward some feasible countermeasures. Is the main owner of the construction market, as the investment of the project, with construction project organization and implementation of the whole process management; and the implementation of construction projects is a complex system engineering, has its intrinsic objective law, need to adopt the management mode of management and method to achieve. With the continuous development of science and technology and construction, the scale of construction projects is becoming larger and larger, and the technology and system are more and more strong, and the complexity is higher and higher. In our new campus construction project, as a representative of Party As site, all kinds of technical and management problems have been challenged in the process of construction, all of which have challenged our own knowledge and experience. Although with the supervision company and the construction enterprises to solve most of the problems, but in some of the problems are not without regret. It is worth thinking, summed up the success and failure, gain and loss, and all construction industry colleagues. First, we should pay special attention to the design stage of the project cost control The new campus of the hospital is in the process of building the former owner hands received, because the owners lack of professional knowledge, combined with the overall plan of the designer and the single project is not a designer, inappropriate design and design management confusion to our subsequent work created a very passive situation. This inclu

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档