塔吊安全交底(Tower crane safety disclosure).docVIP

塔吊安全交底(Tower crane safety disclosure).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
塔吊安全交底(Tower crane safety disclosure)

塔吊安全交底(Tower crane safety disclosure) DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Tower crane safety test tower crane safety disclosure Construction unit: construction unit: China Construction two Bureau three company Project Name: tower crane safety operation specification disclosure contents (1) of the tower crane rail foundation or concrete foundation must go through design, inspection before use, should be based around the building slope and drainage facilities, and to maintain a safe distance from the pit. (2) the tower crane foundation soil bearing capacity must be strictly according to the original provisions or comply with the tower: medium for 8 ~ 12t/ square meters, the heavy tower is 12 ~ 16t/ square meters. (3) the disassembly and assembly of the tower crane must be carried out by the professional team which has obtained the qualification certificate of disassembly and assembly issued by the administrative department of construction, and the technical and security personnel should be present in the process of dismounting. (4) and personnel should wear safety protection products, should fasten the safety belt when working at height, familiar with and implement disassembly process and operation rules. (5) the lifting, installation and disassembly shall not be carried out when the wind reaches over four. Check the connection of all parts of the hydraulic jacking system before jacking up. No swing arm and other operations are prohibited during jacking. (6) after the tower crane is installed, the technical inspection and adjustment of the whole machine shall be carried out, and shall be ready for delivery after passing the inspection of the whole stage and the whole machine. In the case of no load, the deviation of the verticality between the tower and the ground shall not exceed 4/1000. The motor and hydraulic parts of the tower crane shall be carried

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档