浅析高层建筑电气管路预留预埋(Analysis of high-rise building electrical pipelines embedded reserved).docVIP

浅析高层建筑电气管路预留预埋(Analysis of high-rise building electrical pipelines embedded reserved).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅析高层建筑电气管路预留预埋(Analysis of high-rise building electrical pipelines embedded reserved)

浅析高层建筑电气管路预留预埋(Analysis of high-rise building electrical pipelines embedded reserved) Analysis of high-rise building electrical pipelines embedded reserved Abstract: in combination with the on-site construction management experience, an analysis of several problems should be noticed in high-rise building electrical pipelines embedded reserved during construction. Key words: high-rise building; electrical circuits; reserved embedded; review; control; grasp With the progress of society, the development of science and technology, the function of the high-rise buildings is becoming more and more intelligent, more complex pipeline. Electrical installation professional system is complete, including power distribution, lighting, lightning protection, automatic fire alarm and fire linkage control, integrated wiring, building automation, security monitoring, radio telephone, cable TV, garage management system, the system of electrical line reserved for embedded work with design and construction specifications are reasonable and orderly; economical and practical, has a great influence on the later installation work smoothly, the construction should pay attention to several problems in the process of doing a brief analysis. A drawing 1, review the professional construction drawings. (1) to determine the pipe: a project the original design for buckling of thin-walled steel tube, because the high-rise building materials in Qingdao area as a basic embedded pipe is not used, considering the buckling in concrete vibrating rod vibration may be loose, prone to plug the pipe joint grouting hole; at the same time in June 1, 2002 the implementation of the construction of electrical engineering construction quality acceptance chapter fourteenth main projects: galvanized steel only with special grounding card jumper grounding, such practices as a phi 6 steel welding jumper grounding construction is convenient and reliable. So the indoor concealed pipes for welding pipe, indoor surface pip

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档