- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电气布线(Electrical Rough-in)
电气布线(Electrical Rough-in)
The design of power supply and lightning protection of Wenzhou new Guoguang Commercial Plaza
Source: Author: unknown network finishing published: 2007-05-11 paper: Abstract: introduced a new Guoguang commercial plaza of power supply and distribution system, the advantages of 10kV loop network distribution system, diesel generator capacity selection, lightning protection and grounding system design etc.. Keywords: Commercial Plaza power supply lightning protection design 1
2.5.6 grounding
Low voltage distribution system using TN - S system, electrical equipment with protective earthing, dedicated PE line. Along the long vertical laying electricity shaft to a 50 x 5 copper as PE trunk (by the ground landlord, also with 2 steel leads) layer PE trunk (transverse bridge attracted by substation local equipotential bonding terminal leads) ZR - VV - 1 * 185mm2 (to a strong electric shaft cited a root), in which the well and into the shaft after the vertical PE trunk (50 x 5 bar) reliable links as a whole. Each layer is ready to protect the shaft by PE trunk leads to the ground special terminal row, PE line underground residential distribution box and each layer are the.
Freezer, shopping malls and part of the radial distribution of equipment Px power line by line with respective substation leads (i.e. three-phase five wire).
The protection of cable support, cable tray earthing, the substation grounding grid welding leads to 25 * 4 respectively with galvanized flat steel bracket or bridge laying and welding connection.
2.5.7 fire fighting equipment distribution
Fire fighting equipment distribution by NH - VV or NH - BV fire resistant cable wire steel tube wear concealed, and dual power supply automatic switching terminal.
3 lightning protection, grounding and equipotential connection
The project is the two lightning protection building. Grounding for TN - S system. Lightning protection grounding transformer neutral point, working grounding, protecti
您可能关注的文档
- 沈阳建筑大学05年材料学专业考研复试考试大纲(Shenyang Construction University, 05 years of materials science, postgraduate examination retest examination outline).doc
- 沙尘之锁快速攻略(Dust lock).doc
- 沈阳市居住建筑间距和住宅日照管理规定(Regulation of residential building spacing and residential sunshine in Shenyang).doc
- 沙砾碎石(Gravel).doc
- 沪市历年重要点位的市盈率a股历史大底和大顶统计(Shanghai important point earnings a top end of history and statistics).doc
- 河北润田产品简介(Hebei Runtian products).doc
- 沙发文化(Sofa culture).doc
- 河北省冀州中学2010—2011学年度高三一轮复习效果检测二化学文库(Jizhou middle school in Hebei province 2010 - 2011 academic year review effect test, two chemical library).doc
- 河北省建筑工程预算综合基价(Comprehensive budget base construction in Hebei Province).doc
- 汽车轮胎 补漏(Automobile tyre repair).doc
- 2025年烟台芝罘区事业单位公开招聘.doc
- 2025-2026历史岳麓版必修1单元检测:第一单元 中国古代的中央集权制度 (2).doc
- 陕西省渭南市大荔县2024-2025学年高二下学期期末质量检测政治试题(含解析).pdf
- 山东省济宁市2024-2025学年高一下学期期末质量检测政治试卷(含解析).pdf
- 山东省青岛市2025届高三上学期9月期初调研检测政治试卷(含解析).pdf
- 云南省昆明市西山区2024-2025学年七年级下学期7月期末考试英语试题(含答案).pdf
- 江西宜春丰城市第九中学2025届九年级上学期开学考试道德与法治试卷 (含答案).pdf
- 云南省大理白族自治州2024-2025学年八年级下学期期末历史试题(含答案).pdf
- 江苏省宿迁市沭阳县2024-2025学年八年级下学期期末考试英语试题(含答案、听力原文,无音频).pdf
- 山东省聊城市2024-2025学年高二下学期期末教学质量抽测政治试卷(含解析).pdf
文档评论(0)