砼缺陷处理(Concrete defect treatment).docVIP

  • 5
  • 0
  • 约 24页
  • 2017-08-22 发布于河南
  • 举报
砼缺陷处理(Concrete defect treatment)

砼缺陷处理(Concrete defect treatment) A description of the preparation: The Three Gorges Permanent Shiplock project of underground water conveyance system The concrete defect treatment work instructions Sanlian company In December two 000 years 1. preparation instructions Permanent lock underground water tunnel concrete construction has some defects such as surface quality, interlayer on dislocation of hanging curtain, honeycomb, water bubbles, splicing template imprint, template deformation caused by concave and convex surface of concrete, local peeling, surface damage, surface roughness exceeds t

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档